USNH, representing University of New Hampshire Facilities Project Management (UNH FPM), is requesting bids for the Memorial Union Building Elevator Controller Replacements.
**Memorial Union Building - Elevator Modernization**, 83 Main Street, Durham, NH 03824.
Work to replace and upgrade elevator equipment and cabs by others. Coordinate with Owner's elevator scope of work.
Provide fire stopping at penetrations in fire rated assemblies.
Existing rated assemblies shall be maintained. Any modifications to assemblies will need to maintain fire-resistance rating.
Keynotes
1. Remove existing door, frame, and hardware.
2. Provide hollow metal door and frame and door hardware. Provide metal ventilation louver and fire damper.
3. Cut and patch existing GWB ceiling to accommodate mechanical exhaust fan.
4. Remove, salvage and reinstall existing ACT ceiling system to allow for replacement of mechanical ductwork. Replace and match existing ceiling tiles damaged during construction.
5. Provide fire stopping assembly at existing metal conduit penetrations.
6. Modify existing masonry wall to accommodate mechanical louver/duct. Coordinate opening size with mechanical drawings.
Responses shall be transmitted electronically through UShopNH. The Event will close automatically at the due date and time. Each respondent is solely responsible for the timely submission of its response. Late submittals will not be accepted. Responses submitted by any other method will not be accepted.
Submission documents should be uploaded as a single document in pdf format unless otherwise indicated.
Responses are not final upon completion of the fields and uploading documents. In order to finalize the response, it is critical for the respondent to Review and Submit the proposal or it will not be available in UShopNH for owner consideration.
Questions and inquiries concerning this solicitation shall be submitted through the UShopNH Event Q&A Board.
All bids shall remain in full force and effect for a bid acceptance period of not less than thirty (30) calendar days following the date for opening of bids.
Within ten (10) business days after the Owner delivers a Notice of Acceptance, Agreement or Purchase Order, or prior to beginning work on campus, whichever is sooner, the successful Firm shall deliver to the Owner the Certificate of Insurance as specified in the USNH Insurance Requirements.