FURNISH AND DELIVER GRAVITY THICKENER EQUIPMENT FOR GRAVITY THICKENER TANKS NO. 1 AND NO. 2 (REBID)

Active BCUA-BID-26-04-R1 IFBConstruction - Heavy & CivilBergen County Utilities Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Bergen County Utilities Authority (New Jersey) posted this IFB on Nov 25, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Solicitation number BCUA-BID-26-04-R1.

Solicitation details

General information

Solicitation number
BCUA-BID-26-04-R1
Notice type
IFB
Place of performance
New Jersey

Agency and category

Agency
Bergen County Utilities Authority
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Bergen County Utilities Authority (BCUA) is pre-purchasing two new gravity thickener mechanisms for the existing Gravity Thickener Tanks No. 1 and No. 2 at the Little Ferry Water Pollution Control Facility.

Each tank is 65 feet in diameter with a 10-foot side water depth. Each mechanism is a complete center-column, side-feed, peripheral-overflow unit with a center drive and four rake arms, rated for 200,000 ft-lbs. of torque.

Scope

Each mechanism is a complete center-column, side-feed, peripheral-overflow unit with a center drive and four rake arms, rated for 200,000 ft-lbs. of torque. The contract also covers a spare parts package, 3D scanning and field verification of the existing tank geometry, storage inspections, and on-site supervision of installation, testing, and training. The Project also includes all other Work of any type or description necessary for completion of the Project, whether or not specifically described in these Contract Documents.

Low-Voltage Electric Motors

Low-voltage electric motors shall be provided in accordance with the requirements specified under this Section and the Contract Drawings. [...] All costs for Work required by this Section shall be included in the **lump sum bid price**.

[...] Contractor shall submit Shop Drawings and material specifications for the approval of the Engineer. [...] Shop test and field test reports shall be submitted. Manufacturer’s site visit and acceptance testing reports shall be submitted. Operation and Maintenance Manuals shall be submitted in accordance with this Section and the Specifications.

[...] Spare parts shall include the following:

- One (1) complete set of electric motor(s) for one (1) gravity thickener mechanism. Spare motor(s) shall be identical to those supplied with the thickener mechanism, including all required accessories and mounting hardware.

[...] Motors shall be designed, built, and tested in accordance with the latest applicable editions of ANSI/IEEE, NEMA, and UL. [...] Motors shall be premium efficiency type and shall have nominal efficiencies in accordance with NEMA MG1.

Additional information

The Local Unit reserves the right to accept or reject any or all bids, to waive minor identified irregularities and technicalities, and to award in whole or in part to the **lowest responsible bidder**, as allowed under applicable laws. [...] any bid which is incomplete, obscure, or irregular shall be rejected

[...] The effective period of this contract will be **two years** unless otherwise noted in the specifications. Continuation of the terms of this contract beyond the fiscal year is contingent on availability of funds in the following year's budget.

[...] No firm may be issued a contract unless they comply with the EEO/AFFIRMATIVE ACTION REGULATIONS of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 et seq. as amended from time to time, and the AMERICANS WITH DISABILITIES ACT 42 U.S.C. 12101.

[...] Any prospective bidder who wishes to challenge a bid specification shall file such challenges in writing with the contracting agent **no less than three business days prior to the opening of the bids**.

[...] This is a firm fixed contract, prices firm, FOB local unit's locations.

Documents

16 files

Subscribe to get these 16 documents.

  • 26-04 Acknowledgement of Receipt of Addenda 2026-11-23.pdf
    Download
  • 26-04 Bid Bond 2026-09-23.pdf
    Download
  • 26-04 Bid Document Submission Checklist 2026-11-24.pdf
    Download
  • 26-04 Bid Item Key and Acceptance Form 2026-11-23.pdf
    Download
  • 26-04 Consent of Surety 2026-09-23.pdf
    Download
  • 26-04 Disclosure of Investments in Iran 2026-09-23.pdf
    Download
  • 26-04 Disclosure of Prohibited Activites in Russia or Belarus 2026-09-23 (1).pdf
    Download
  • 26-04 Drawings 2026-09-23 Signed.pdf
    Download
  • 26-04 Mandatory Affirmative Action Language Exhibit A and B 2026-09-23.pdf
    Download
  • 26-04 Non-Collusion Affidavit 2026-09-23.pdf
    Download
  • 26-04 Ownership Disclosure 2026-09-23 (1).pdf
    Download
  • 26-04 Statement of Qualification Certifications 2026-09-23.pdf
    Download
  • 26-04 Technical Specifications 2026-09-23 Signed (1).pdf
    Download
  • BCUA Supplemental Terms Contract 26-04.pdf
    Download
  • General Requirements Acknowledgement Form 2026 - BCUA.pdf
    Download
  • Notice to Bidders Contract 26-04 Rebid published 11.25.26 FINAL.pdf
    Download

Similar open bids