New Jersey Housing and Mortgage Finance Agency (New Jersey) posted this RFQ on Nov 25, 2026. Responses are due Dec 16, 2026. Category: Architecture & Engineering. Questions are due 2026-12-02 14:00. Solicitation number 2026-092.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The New Jersey Housing and Mortgage Finance Agency (hereinafter referred to as the “Agency” or “NJHMFA”) is issuing this Request for Quote (“RFQ”) for a qualified engineering firm to provide full specifications, estimates, construction administration and project management services for the replacement of the roofing system on the 637 Building located at 637 South Clinton Avenue, Trenton NJ based on its age and wear and periods of water intrusion. The project will entail the removal of the existing roof system and replacement with a new roofing system, as determined by the Contractor, for both the lower roof covering 637 Building and the upper roof covering Galleries A and B.
The general design goals of the project include the assessment and design of the roof replacement system to address deterioration in creating unsafe conditions and water penetration. The approximate roof size of the 637 building is 66,000 sq. ft. Vaulted areas are not included, but must be considered in the replacement design.
The Contractor shall provide all investigatory services and prepare all necessary specifications and design plans for the replacement of the existing roofing system, to include, but not limited to:
1. A design specification that includes but is not limited to a detailed analysis of the existing roof, a detailed list of materials to be replaced/upgraded, schedule to completion and a set of standards to be utilized by the contractor performing the work as well as a detailed description of the logistics necessary to complete the work, crane/lift placement, weekend work and weekly scheduling.
2. Preparation of all drawings necessary to apply for permitting to DCA which shall include, but not be limited to, construction details, location of all new equipment to provide for proper installation, and connection with existing HVAC infrastructure. All permit fees shall be paid by the contractor.
3. All other documents required to assure that the contractor will have a complete understanding of the nature and scope of the work to minimize change orders.
List of Design Components
Cost Estimating
Construction Administration
[...]
Construction and Close-Out Phases
[...]
All quotes must be **submitted electronically through the Agency’s Procurement Portal** at https://njhmfa.bonfirehub.com by **11:00 AM on December 16, 2026** to be considered. For sufficient time, it is strongly recommended that the uploading process and finalizing of the quote submission documents begin at least ONE (1) day before the quote opening time. No quotes will be received after the quote opening date and time. Only those Quotes submitted in the procurement portal will be accepted.
The Agency reserves the right to reject any and all Quotes if deemed to be in the best interest of the Agency to do so.
[...]
The Evaluation Committee will be responsible for evaluating Quotes and recommending selection of bidders for award of contracts, based on evaluative criteria outlined in this RFQ.
[...]
A minimum of **three references** (excluding NJ Housing and Mortgage Finance Agency), of similar Projects or Contracts, must be provided. List any government Contracts first.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.