Connecting Communities: A Multi-Modal Vision for West State Street

Active 2140756 RFQuArchitecture & EngineeringCity of Olean
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Olean (New York) posted this RFQu on Nov 12, 2026. Responses are due Dec 15, 2026. Category: Architecture & Engineering. Questions are due 2026-12-01 14:00. Solicitation number 2140756.

Solicitation details

General information

Solicitation number
2140756
Notice type
RFQu
Place of performance
New York
Questions due
2026-12-01 14:00

Agency and category

Agency
City of Olean
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Olean is soliciting Statements of Qualifications and a Proposal from consultants for professional engineering, design, construction management, and inspection services for a new streetscape of West State Street (New York State Route 417) between North Union Street and Francis Road at St. Bonaventure University.

The City of Olean has identified a need to install enhancements to approximately 2.5-miles of Complete Street improvements on West State Street (NYS 417) between North Union Street (NYS 16) and Francis Road at St. Bonaventure University. Improvements include a two-way protected bike lane or shared-use path, bump-outs and pedestrian refuge islands, marked crosswalks, pedestrian crossing signals and ADA improvements, green infrastructure, approximately five traversable mini-roundabouts, and pedestrian and public transit amenities.

The project is funded by the City of Olean and the U.S. Department of Transportation Fiscal Year 2025 Build Program.

Scope

The project has been planned to a 30% level conceptual design. The City of Olean expects design, environmental work and engineering to be completed within 12 months of Notice to Proceed to meet the scheduled construction completion date.

Work Scope

  • Work Element 1 – Project Administration/Management: Consultant to provide contract administration and invoice processing.
  • Work Element 2 – Environmental: The consultant shall conduct necessary site investigation, environmental, social and economic analysis, and prepare sufficient documents for FHWA to review and approve.
  • Work Element 3 – Roadway Design: Consultant will advance roadway design from 30% to final design and incorporate comments.
  • Work Element 4 – Landscaping Design to include Green Practices: Consultant will advance the landscaping design from conceptual to final design.
  • Work Element 5 – Public Involvement: Conduct public meetings throughout the design process to gather input on final design, landscape and streetscape details.
  • Work Element 6 – Traffic Design: Consultant will advance traffic design from 30% to final design and incorporate comments.
  • Work Element 7 – Ingress/Egress Modifications: Refine access design as shown in the 30% plans and support limiting access/curb cuts, where appropriate.
  • Work Element 8 – Utility Coordination and Plan Development: Consultant will provide overall utility coordination/management, including subsurface utility engineering for the project.
  • Work Element 9 – Drainage Design.
  • Work Element 10 – Storm Water Management Plan & Storm Water Pollution Prevention Plan (SWPPP).
  • Work Element 11 – Supplemental Survey and Right-of-Way: Survey will be needed for the entire corridor.
  • Work Element 12 – Subsurface Utility Engineering.
  • Work Element 13 – Streetscape and Lighting Design.
  • Work Element 14 – Plan Production and Quality Assurance (QA) and Quality Control (QC): The consultant will submit 60%, 90% Design Review Plans, PS&E Plans and Advertisement Documents.
  • Work Element 15 – Geotechnical Services and Pavement Design.
  • Work Element 16 – Construction Management and Inspection Services: The consultant will provide construction management and full-time inspection services throughout the project.
  • Work Element 17 – Project Reporting and Closeout.

The consultant will identify all permits, reviews, and approvals required that are necessary for the project and shall obtain all such permits and approvals. Consultant will prepare specifications in the FHWA format, including project special provisions, at the 90% design level.

Additional information

Submission

Proposals shall be submitted electronically to kkerper@cityofolean.gov, in PDF format via email attachment, and the subject line must state Request for Qualifications: Connecting Communities. All electronic submissions must be no larger than 20 MB to ensure proper email delivery. Five hard copies of the proposals shall also be delivered prior to the deadline. Late proposals will not be accepted.

Evaluation Criteria

  • Demonstration of understanding of the project objectives: 30%
  • Qualifications of the project team: 20%
  • Experience with FHWA Funded Projects of similar size, scope and complexity: 20%
  • Project Approach: 15%
  • Organization, timeframe and scheduling: 15%

This is a qualification-based procurement process. The committee may decide to invite the highest ranked firms to meet with the committee and present their team, discuss their proposals and answer questions. Once the top ranked firm is determined, the City of Olean will request a Fee Proposal.

Key dates

  • Final Addendum Posted: 12/08/2026
  • Interviews, the weeks of: 01/04/2027
  • Notice of Award: 01/13/2027
  • Approximate Design and Engineering Start Date: 01/25/2027

Documents

2 files

Subscribe to get these 2 documents.

Similar open bids

In New York