State University of New York (New York) posted this IFB on Nov 25, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Solicitation number 2141223.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The State University of New York at Canton will receive sealed bids for project number L23180-01 titled Campus-Wide Metering Upgrades Phase 2 until **2:00 p.m. local time on December 17, 2026**, at French Hall Room 206, where such proposals will be publicly opened and read aloud.
All Work Proposed Must Be Completed by March 31, 2027
TELECOMMUNICATIONS GENERAL NOTES
1. PROVIDE ONE (1) EXTREME 4220 12P-4X 12 PORT NETWORK DATA SWITCH PER DATA RACK SHOWN ON THE DRAWINGS. PROVIDE FIBER SFP MODULE AND FIBER JUMPER CABLE AND CAT 6A PATCH CABLES AS REQUIRED.
2. THE CONTRACTOR IS RESPONSIBLE FOR PATCHING AND RESTORING EXISTING FINISHES TO WHERE FOUND CONDITION EQUAL TO OR GREATER THAN THE CONDITION THE SURROUNDING SURFACES IN ALL AREAS WHERE DEMOLITION OCCURS, THIS INCLUDES PATCHING HOLES, MATCHING EXISTING PAINTED SURFACES, PAINTING DEMO AND PATCHED AREAS, PROVIDING BLANK COVER PLATES FOR ABANDONED JUNCTION BOXES, ETC.
[...]
ELECTRICAL GENERAL NOTES
1. ELECTRICAL WORK SHALL CONFORM TO ALL STATE, LOCAL, AND NATIONAL ELECTRICAL CODES.
[...]
9. CONTRACTOR SHALL CONNECT METERS TO EXISTING METER MONITORING SOFTWARE AND PROVIDE ANY PROGRAMMING REQUIRED TO MAKE FUNCTIONAL.
[...]
KEYED NOTES
1. REMOVE AND REPLACE EXISTING METER AND METER SOCKET. REFER TO SCHEDULE ON DRAWING E-501 FOR ADDITIONAL INFORMATION. COORDINATE WITH OWNER AND ENGINEER ALL REQUIRED SHUTDOWNS OF ELECTRICAL EQUIPMENT FOR THE INSTALLATION OF NEW METER AND METER CABINET.
2. EXTEND EXISTING GAS METER PULSE WIRING (6 CONDUCTOR CABLE) IN 3/4" CONDUIT FROM GAS METER TO NEW ELECTRIC METER. (TYPICAL)
3. EXTEND EXISTING WATER METERS PULSE WIRING (3 CONDUCTOR CABLE) IN 3/4" CONDUIT FROM WATER METER TO NEW ELECTRIC METER. (TYPICAL)
4. REUSE EXISTING CT'S WITHIN EXISTING SWITCHGEAR AND CIRCUIT TO NEW METER.
5. REUSE EXISTING FUSE BLOCKS WITHIN EXISTING SWITCHGEAR FOR VOLTAGE METERING.
6. REUSE EXISTING CONTROL POWER CIRCUIT TO POWER NEW METER.
7. PROPOSED ROUTE OF METER CIRCUITRY. ALL CIRCUITRY SHALL BE CONCEALED ABOVE CEILING. [...]
8. REMOVE EXISTING BMS METER AND ASSOCIATED CT'S AND PT'S WIRING.
Bidding and Contract Documents may be examined free of charge at the campus and at the following locations.
SUNY Canton, Cooper Service Complex, 34 Cornell Drive Canton, NY 13617
Complete sets of Contract Documents for bidding may be downloaded at the below website: http://www.canton.edu/procurement/bid_materials.html
**Bids must be submitted in duplicate** in accordance with the instructions contained in the Information for Bidders. Security will be **required** for each bid in an amount not less than **five (5) percent** of the Total Bid.
The State University of New York reserves the right to reject any or all bids.
Subscribe to get these 2 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.