Lake Management Services for Beaver Dam Lake

Active 2141126 RFPEnvironmental ServicesOrange County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Orange County (New York) posted this RFP on Nov 23, 2026. Responses are due Dec 10, 2026. Category: Environmental Services. Questions are due 2026-11-25 15:00. Solicitation number 2141126.

Solicitation details

General information

Solicitation number
2141126
Notice type
RFP
Place of performance
New York
Questions due
2026-11-25 15:00

Agency and category

Agency
Orange County
Category
008Environmental Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The County of Orange (“County”) is seeking proposals from qualified consulting firms (“Consultant”) to provide lake and watershed assessment, water quality monitoring, and lake management planning services for Beaver Dam Lake located in the Towns of Blooming Grove, Cornwall and New Windsor.

The selected Consultant shall develop scientifically defensible assessments, decision-support tools, and a comprehensive Long-Term Lake Management Plan to support the County’s efforts to improve water quality, reduce nutrient and bacterial inputs, manage aquatic vegetation, and establish a sustainable, long-term management strategy for Beaver Dam Lake.

Scope

The Consultant shall propose a project-specific technical approach that addresses each outcome and its associated performance requirements and deliverables. The County has identified the minimum required components below. [...]

Outcomes

  • Actionable Lake and Watershed Monitoring Framework: Establish a monitoring program capable of characterizing lake conditions, watershed inputs and changes over time.
  • Watershed Contribution Characterization: Identify and evaluate the principal sources and pathways of nutrient and bacterial inputs to the lake.
  • Quantified Internal Nutrient Loading: Evaluate and estimate the potential contribution of internal nutrient loading to lake conditions.
  • Integrated Nutrient Budget and Reduction Targets: Develop an integrated assessment of nutrient sources and establish scientifically supported nutrient reduction targets.
  • Long-Term Lake Management Plan: Prepare an implementable management plan with measurable objectives, prioritized actions, implementation phases, and a monitoring and evaluation framework.
  • Project Management and Communication: Maintain transparent project tracking, provide regular progress updates and communicate technical findings to the County and Advisory Board.
  • Supplemental Lake Management Consulting Services: Provide additional lake management, technical consulting and grant-related assistance when authorized by the County.

Selected deliverables

  • A written lake and watershed monitoring plan identifying sampling locations, parameters, frequency, collection procedures, quality assurance and quality control (QA/QC) measures, laboratory requirements, data management procedures, and volunteer responsibilities.
  • An annual aquatic plant survey report that includes survey methods, mapped distribution, relevant vegetation metrics, invasive species observations, post-treatment findings where applicable, and interpretation of observed trends.
  • A watershed assessment report describing relevant watershed characteristics, pollutant sources, nutrient and bacterial transport pathways, and factors affecting pollutant delivery to the lake.
  • Sediment sampling and laboratory analysis at a minimum of six (6) locations distributed across the lake and representative of its major depth zones.
  • A spreadsheet-based lake nutrient budget model with documented inputs, calculations, assumptions, sources, and limitations.
  • A draft Long-Term Lake Management Plan submitted for County and Advisory Board review.
  • A final Long-Term Lake Management Plan incorporating County-directed revisions and addressing applicable elements of the EPA Nine-Element framework.
  • Monthly written progress updates by email summarizing work completed, work anticipated during the next reporting period, deliverable status, schedule or budget concerns, and issues requiring County direction.
  • One virtual annual presentation to the Advisory Board summarizing project activities, monitoring results, significant findings, and recommended next steps.

Additional information

Proposals must be in sealed envelopes clearly marked on the outside packaging with RFP-DPW012-26, Lake Management Services for Beaver Dam Lake addressed to Renee Arnold-O’Regan, Commissioner, Department of General Services, PO Box 218, 255-275 Main Street, Goshen, New York 10924 and received up to and including **Thursday, December 10, 2026 at 4:00 PM, prevailing time**. Faxed and/or e-mailed proposals are not permitted. NO LATE BIDS WILL BE ACCEPTED – NO EXCEPTIONS!

Two (2) sets of all proposals must be submitted, ONE (1) SET OF WHICH MUST CONTAIN ORIGINAL SIGNATURES, including completed copies of any forms or certifications required in this RFP.

There are no Bonds required for this contract.

During the term of a contract resulting from this RFP, or longer if required, successful offeror shall maintain, at its expense, worker’s compensation, disability and liability insurance policies of the types and minimum coverages specified in the form contract provided with this RFP.

Documents

8 files

Subscribe to get these 8 documents.

Similar open bids

In New York