Opportunity for M/WBE - CAT-475 Gilboa Dam High Level Outlet Installation

Active 2140994 RFQConstruction - Heavy & CivilJett Industries, Inc.
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Jett Industries, Inc. (New York) posted this RFQ on Nov 24, 2026. Responses are due Dec 31, 2026. Category: Construction - Heavy & Civil. Solicitation number 2140994.

Solicitation details

General information

Solicitation number
2140994
Notice type
RFQ
Place of performance
New York

Agency and category

Agency
Jett Industries, Inc.
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

A High Level Outlet (HLO) will be constructed at Gilboa Dam. The HLO intake will be a two‐chambered structure, referred to as the High Level Release Tower (HLRT) housing the hydraulic controls on an enclosed operating floor. The HLRT shall be equipped with guide slot assembly, twin bonneted knife gate valves, an air vent pipe, and a removable bar rack, which can be switched with a removable temporary bulkhead.

Scope

The HLRT shall be constructed upstream of the existing Upper Gate Chamber (UGC) against the upstream face of the dam. A tunnel will be hand-mined through the dam, a new pipe shall be constructed to convey water from the HLRT to an Outfall Structure at the downstream Spillway steps. The existing Spillway crest gates that occupy the Spillway notch shall be removed along with their ancillary mechanical and electrical equipment, instrumentation, and controls in the UGC.

After the gates are removed, the portion of the Spillway presently occupied by the crest gates shall be backfilled with reinforced mass concrete to match the crest and Spillway step pattern. Other components of the Work include installation of fall protection features, a waterproof access door, stairways, and hatches and instrumentation upgrades that include remote monitoring and control of the HLO flow, integrated into the existing SCADA system, and flow monitoring within the HLRT and at the plunge pool’s end sill.

Additional information

All quotes must be submitted through the Building Connected platform. Contact the scope lead if there are any questions or issues with submissions.

Project documents and Scope details will be posted to the Files tab of Building Connected. Jett will upload to the FILES tab on Building Connected all addenda as received by the Owner. Bidders are required to acknowledge receipt of addenda in writing on the Bid Proposal form or their quote.

All requests for clarification must be submitted in writing and sent by email or as a message through Building Connected.

  • Union
  • Service-Disabled Veteran-Owned Business (SDVOB) Goal: 0.00%
  • Total MWBE Goals: 13.00%
  • Disadvantaged Business Enterprise (DBE) Goal: 0.00%