Jett Industries, Inc. (Jett - Contractor) is assembling a bid for the A High Level Outlet (HLO) will be constructed at Gilboa Dam.
The HLO intake will be a two‐chambered structure, referred to as the High Level Release Tower (HLRT) housing the hydraulic controls on an enclosed operating floor.
The HLRT shall be equipped with guide slot assembly, twin bonneted knife gate valves, an air vent pipe, and a removable bar rack, which can be switched with a removable temporary bulkhead. The HLRT shall be constructed upstream of the existing Upper Gate Chamber (UGC) against the upstream face of the dam. A tunnel will be hand-mined through the dam, a new pipe shall be constructed to convey water from the HLRT to an Outfall Structure at the downstream Spillway steps.
The existing Spillway crest gates that occupy the Spillway notch shall be removed along with their ancillary mechanical and electrical equipment, instrumentation, and controls in the UGC. After the gates are removed, the portion of the Spillway presently occupied by the crest gates shall be backfilled with reinforced mass concrete to match the crest and Spillway step pattern.
Other components of the Work include installation of fall protection features, a waterproof access door, stairways, and hatches and instrumentation upgrades that include remote monitoring and control of the HLO flow, integrated into the existing SCADA system, and flow monitoring within the HLRT and at the plunge pool’s end sill.
Project documents and Scope details will be posted to the Files tab of Building Connected.
Jett will upload to the FILES tab on Building Connected all addenda as received by the Owner. A notification through Building Connected will be sent to Bidders. Bidders are **required** to acknowledge receipt of addenda in writing on the Bid Proposal form or their quote.
Any Bidder, no later than the date posted on the Project Information Page, may submit questions for interpretation or clarification of, or addenda to, this Bid. All requests must be submitted in writing and sent by email or as a message through Building Connected.
**All quotes must be submitted through the Building Connected platform.** Contact the scope lead if there are any questions or issues with submissions.
Total MWBE Goals: **13.00%**. SDVOB Goal: 0.00%. DBE Goal: 0.00%.