Village of Briarcliff Manor (New York) posted this IFB on Nov 19, 2026. Responses are due Dec 11, 2026. Category: Construction - Heavy & Civil. Solicitation number 2141029.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
NOTICE IS HEREBY GIVEN that sealed bids will be received by the Village of Briarcliff Manor until **11:00 a.m. on Friday, December 11, 2026**, at the Village Offices, 1111 Pleasantville Road, Briarcliff Manor, NY 10510, at which time and place said sealed bids will be publicly opened and read aloud for completion of the following work:
WATER MAIN REPLACEMENT AT SLEEPY HOLLOW ROAD
This opening will be available to view via ZOOM.
The Contractor shall furnish all labor, materials, equipment, supervision and incidentals necessary to complete the Sleepy Hollow Road Water Main Improvements in accordance with the Contract Drawings, Technical Specifications, these Special Conditions and the applicable requirements of the Village of Briarcliff Manor, Westchester County Department of Health (WCDOH), and New York State Department of Transportation (NYSDOT):
1. The Work includes approximately 109 linear feet of 6-inch Class 54 ductile iron water main, removal and replacement of the existing tee, connections to existing mains, appurtenances and fittings shown on the Drawings, abandonment of designated existing facilities, excavation, backfilling, testing, disinfection, and restoration of disturbed areas.
2. The Contract is based on the unit and lump-sum prices set forth in the Bid Schedule of Prices. Estimated quantities are approximate and payment shall be based on the applicable Contract provisions and authorized quantities completed.
3. All pipe installation and connections shall include required fittings, restraint, thrust blocking, excavation, bedding and backfill, unless expressly provided as separate payment items.
4. All work shall be performed in a safe manner. The Contractor shall clean each work area at the end of every shift and shall not leave debris or unprotected excavations in a public roadway.
5. All maintenance and protection of traffic shall be performed by the Contractor and paid under Bid Item 1400, subject to the payment terms below.
6. Applicable pavement restoration thicknesses, materials and limits shall be those shown on the Contract Drawings and approved by NYSDOT.
8. The Contractor shall comply with all applicable New York State Department of Transportation (NYSDOT) regulations, Standard Specifications, approved plans, Highway Work Permit requirements, and any additional conditions imposed by NYSDOT.
**Submission:** All bids must be submitted in **sealed envelopes** plainly marked SLEEPY HOLLOW ROAD WATER MAIN IMPROVEMENTS CONTRACT NO. VM-2627-05. Bid Package can only be obtained at https://www.bidnetdirect.com/new-york/briarcliffmanor. All addenda and other bid-related updates will be posted to BidNet Direct.
**Bid security:** A bid bond, certified check or bank check in the amount of **5% of bid** must accompany the bid proposal.
**Award:** The contract will be awarded to the lowest and/or best-qualified responsible Bidder who complies with these instructions and with the Legal Notice. No Bidder may withdraw his Proposal for a period of 45 days after the date of opening thereof.
**Bonds:** The Performance and Payment Bonds shall each be in the full Contract amount, and the Maintenance Bond shall be 100% of the Contract amount for two (2) years from final acceptance.
**Insurance:** Commercial General Liability, Automobile Liability, Workers' Compensation, Employers' Liability, New York State Disability Benefits and Excess/Umbrella Liability.
**Time:** Substantial Completion shall be achieved within FORTY-FIVE (45) consecutive calendar days after commencement of Contract Time. Final Completion shall be achieved by December 1, 2027 or within THIRTY (30) consecutive calendar days after Substantial Completion, whichever is later.
**Liquidated damages:** SEVEN HUNDRED FIFTY DOLLARS ($750) for each consecutive calendar day Substantial Completion is delayed and TWO HUNDRED FIFTY DOLLARS ($250) for each consecutive calendar day Final Completion is delayed.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.