Dormitory Authority of the State of New York (New York) posted this IFB on Nov 6, 2026. Responses are due Dec 16, 2026. Category: Construction - Building. Solicitation number 2140477.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
DASNY is soliciting bids for the South Campus Electrical Upgrades – Clement Hall Including Asbestos Abatement and Hazardous Materials Abatement project at the University at Buffalo.
Estimated Cost Range:** **$1,250,000.00 – $1,750,000.00
The scope of work includes, but is not limited to:
There is also abatement of asbestos and hazardous materials that will be required to complete the above work.
A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. [...] A purchase of a digital download is required to become a registered planholder.
The bidder or its principals shall have a minimum of five (5) years experience in similar work and shall provide to the Owner on the Minimum Qualifications Form a list of five (5) contracts of similar size, scope, and complexity to this Project completed or substantially completed within the last ten (10) years.
Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.
SDVOB Goal: 3.00%. MBE Goal: 5.00%. WBE Goal: 5.00%.