Tioga County IDA Northern Tioga Rail-with-Trail Pre-Engineering Project

Active 2141009 RFPArchitecture & EngineeringTioga County Industrial Development Agency
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Tioga County Industrial Development Agency (New York) posted this RFP on Nov 19, 2026. Responses are due Feb 5, 2027. Category: Architecture & Engineering. Questions are due 2026-12-30 17:00. Solicitation number 2141009.

Solicitation details

General information

Solicitation number
2141009
Notice type
RFP
Place of performance
New York
Questions due
2026-12-30 17:00

Agency and category

Agency
Tioga County Industrial Development Agency
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Tioga County Industrial Development Agency (TCIDA) purchased Owego Hartford Railroad, an active rail corridor in Northern Tioga County, in 1981. The Railroad stretches from Owego to Hartford, NY and is used for freight traffic from Owego to Flemingville. The Northern end of the railroad from Flemingville to Berkshire is minimally used. The TCIDA would like to increase the use of the rail corridor with the addition of a shared-use, recreational Rail-with-Trail alongside the Owego and Hartford Line.

The Northern Tioga Rail-with-Trail will be a 7.5-mile trail that will begin in Newark Valley and end in Berkshire, NY. The rail line will remain in place, and the trail will run parallel to the railroad.

TCIDA is seeking qualified professional engineering consultants to provide proposals for pre-development and design activities for a Rail-with-Trail located alongside the Owego-Hartford line.

**$600,000** Budget for preliminary engineering and design.

Scope

These studies and investigations include, but are not limited to the following:

  • Preliminary Design: Complete predevelopment studies, environmental assessments, ground survey, and conceptual preliminary trail, crossings and bridge crossing design. Prepare pre-construction plans, specifications, and cost estimates for the trail, including any necessary modifications to the existing rail infrastructure and bridges/culverts.
  • Initial Site Assessment: Conduct site visit to confirm field conditions. Review existing documentation relevant to the corridor. Confirm all testing needs (geotechnical, survey, hazmat, cultural, etc.).
  • Surveying and Right-of-Way (ROW) Research: Conduct early survey to identify physical constraints and encroachments. Confirm ROW limits through mapping, deed research, state archive review, and predecessor title investigations. [...]
  • Structures/bridge/culvert inspection and Hydraulics: Evaluate bridges and culverts for load rating and widening potential for a multi-use path. Assess hydraulic capacity of existing and proposed structures.
  • Archaeological and Cultural Review (OPRHP): Prepare cultural resource management plan (kiosks, wayfinding, historian coordination). Conduct additional screenings beyond the rail corridor. Implement cultural mitigation measures.
  • Environmental Screening and Permitting: Screen for wetlands, hazardous waste, and endangered species within corridor and defined buffer. Delineate wetlands and evaluate road crossing areas. [...]
  • Environmental Impacts/Conditions: The Consultant shall complete a SEQR Part I Full Environmental Assessment Form and coordinate with regulatory agencies (NYSDEC, NYS Parks OPRHP, US Army Corps, US Fish & Wildlife, NYS Natural Heritage).
  • Bound Survey: A bound survey report consisting of a project narrative, report of determination, table of research documents considered, table of evidence recovered and field notes. [...]
  • Written Maintenance and Operating Plan: The plan will include tasks like mowing, vegetation control, debris removal, and addressing erosion or hazards and the frequency of maintenance, responsible parties, and associated cost.
  • Project Kickoff: Conduct kickoff meeting with stakeholders.
  • Stakeholder Engagement: Community meetings will be held throughout the course of the project to solicit input from the public.
  • Public Involvement: Initiate public engagement early to gather user input and direction.
  • Coordination with RJ Corman: Coordination with RJ Corman for any on-site needs for design, survey, inspection etc. will be required.
  • Draft and Final Report: A report defining approach and findings of preliminary engineering studies that can be used to apply for future funding for construction.
  • Construction Cost Estimates: Estimates for construction of proposed trail.

Deliverables

A single preliminary engineering and design report is expected and is to include the above outlined studies and investigations. A draft outline report is to be submitted prior to the final report to allow the TCIDA to confirm format and organization of the information as this report will be used for seeking grants and funding. The consultant shall provide a digital copy of the draft and final report.

Additional information

Please submit **sealed bid responses** by **February 5, 2027, at 5:00 PM** to Jonathan Ward, TCIDA Board Chair, c/o Tioga County Department of Economic Development & Planning, 56 Main Street, Room 109, Owego, NY 13827.

Consultant proposals submitted in response to this Request for Proposal must include the following:

1. Company Overview
2. Project Approach
3. Experience – Provide a list of at least three similar projects completed within the past six years and references
4. Personnel – Provide proposed staffing and resumes for those to be assigned to this project
5. Liability Insurance
6. Proposed fee itemized as follows: Project Management; Development of the report; A Scope of Work that includes all items outlined in the above Scope of Work section; Coordination and Progress Meetings; Stakeholder Engagement Meetings; Report Presentation; Reimbursable Expenses (to be billed at cost); Total Proposed Lump Sum Fee

RFP Evaluation Criteria

  • Expertise of the firm's key personnel and subcontractors assigned, if applicable
  • Firm experience in related project requirements
  • Confidence in firm's project examples
  • Firm's demonstrated project understanding
  • Firm's proposed scope of work
  • Firm's ability to manage the project and complete the work on schedule
  • Reasonableness of cost related to provided budget
  • Use of MWBE sub-consultants
  • Perform grant administration services

Final deliverables are due to the TCIDA within 1 year of a signed agreement.

TCIDA reserves the right to reject any and all proposals. All costs associated with preparing a response to this RFP are the responsibility of the Proposer.

It is anticipated that an award will be made on or about March 3, 2027.

Documents

1 file

Subscribe to get this document.

  • EPF259949 Tioga County IDA Northern Tioga Rails-with-Trails Project Request for Proposals.pdf
    Download

Similar open bids