Town of Mooresville (North Carolina) posted this RFQu on Nov 6, 2026. Responses are due Dec 4, 2026. Category: Architecture & Engineering. Solicitation number OpenGov-ea14385e.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The purpose of this Request for Qualifications (RFQ) is to solicit responses from firms that are qualified to provide Master Facility Planning Services for existing and future capital facility projects for the Town of Mooresville. Responding firms must demonstrate a strong background in the planning of municipal facilities, including administrative, operational, public safety, and parks and recreation facilities.
The Town of Mooresville is seeking a comprehensive study and report for space allocation that will address short- and long-term needs for the Town and the community.
1.1. Facility Condition and Lifecycle Assessment
Conduct non-destructive, on-site assessments of Town-identified facilities, evaluating major building systems and relevant site conditions including safety and accessibility. Establish consistent condition ratings, estimate remaining useful life, and identify deficiencies, code and ADA accessibility concerns, life safety issues, and operational needs affecting facility performance.
1.2. Capital Needs Assessment
Identify and prioritize maintenance, repair, renovation, and replacement needs across short-term (0–5 years), mid-term (5–15 years), and long-term (15+ years) planning horizons. Provide recommended corrective actions and cost estimates.
1.3. Space Utilization and Needs Assessment
Evaluate existing space utilization, operational efficiency, services, and opportunities for optimization. Engage department leadership and key staff to establish current and projected space requirements over 5-year, 10-year, and 15-year planning horizons. [...]
1.4. Capital Improvement Planning
Develop a prioritized facilities investment strategy with short-term (0–5 years), mid-term (5–15 years), and long-term (15+ years) implementation timelines, and preliminary cost estimates.
1.5. Asset Database and Documentation
Develop an editable digital database of facility conditions, major systems, and projected capital needs. Organize available facility documentation, identify information gaps, and establish a standardized digital filing structure compatible with Town systems.
Submit full SOQ to Town of Mooresville’s **OpenGov portal** no later than the date and time specified in the RFQ schedule.
The qualifications submittal shall be limited to a maximum number of twenty (20) pages. Failure to comply with the page limits may result in automatic disqualification of the submittal.
Town of Mooresville will consider and evaluate Statements of Qualifications in accordance with N.C.G.S. 143-64.31. Qualification packages will be ranked based on this review. The Town may elect to conduct interviews with a selected number of firms.
Provide copies of Certificates of Insurance (COI) showing General Liability, Automotive, Worker’s Compensation, and Professional Liability Coverage.
*Attachment A* is **required**.
Subscribe to get these 2 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.