Southeastern Community College (North Carolina) posted this RFQu on Nov 13, 2026. Responses are due Nov 23, 2026. Category: Construction - Building. Questions are due 2026-11-18. Solicitation number 124-SCC11132026.
Southeastern Community College invites responses to this Request for Qualifications for a Construction Manager at Risk for the Transportation Technology/STEM Facility (Main Campus) Driving Pad until November 23rd, 2026, by 2:00PM.
The project consists of construction of 500 ft. x 500 ft. asphalt driving pad with a 250 ft. x 250 ft. northwest portion of the diving pad as concrete.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Southeastern Community College invites responses to this Request for Qualifications for a Construction Manager at Risk for the Transportation Technology/STEM Facility (Main Campus) Driving Pad until **November 23rd, 2026, by 2:00PM**. The project consists of construction of 500 ft. x 500 ft. asphalt driving pad with a 250 ft. x 250 ft. northwest portion of the diving pad as concrete.
The objective of this Request for Qualifications (RFQ) is for the Owner to select a Construction Management-at-Risk firm to provide professional construction management services during the design and the construction of the Project as described in this Request for Qualifications (RFQ).
Total Project Budget:** **$6,405,000
Construction of a 500 ft. x 500 ft. asphalt driving pad with a 250 ft. x 250 ft. northwest portion of the diving pad as concrete. The driving pad will be constructed behind the Transportation Technology building, currently under construction. The pad will include perimeter lighting and a viewing pavilion. The viewing pavilion will include lighting, power, and water. The driving pad will support truck driving courses and public safety training, including Basic Law Enforcement Training.
Pre-construction services:
1. Participate in design coordination meetings; review constructability, site logistics, phasing, materials, bid-package interfaces, and construction methods.
2. Prepare and update estimates at agreed design milestones, including applicable design-development and construction-document reviews; reconcile estimates with the designer and advise on budget alignment and cost-effective alternatives.
3. Develop and maintain an integrated design, procurement, construction, and closeout schedule, including coordination with the adjacent building project.
4. Develop bid packages that fully cover the construction documents and minimize gaps and overlaps.
5. Make recommendations for value added and cost-effective measures in conjunction with the design team continuously throughout the design phases.
6. Generate overall project schedule for approval by Southeastern Community College and continuously monitor schedule adherence throughout duration of project.
7. Responsible for prequalification of subcontractors, advertisement and bidding of the subcontractor packages and preparing a Guaranteed Maximum Price – Post Bidding.
8. Determine contractor bid packages. Responsible for coverage of all items shown in the construction documents and division into bid packages.
9. Conduct bid openings for each first-tier subcontractor.
Construction:
Project Completion and Close-out:
Submit** Letter of Interest and *SF-254* via the NC electronic Vendor Portal (eVP) E-Bid. Proposing firms must submit the Letter of Interest and your current *Standard Form 254 (SF 254)* with the information package. **E-mail and Fax submittals will not be accepted.
The Construction Management Fee will be a fixed number based on a percentage of the Cost of Work. For this project, the fee will be negotiated with the most qualified candidate.
Following the evaluation team's initial evaluation of the RFQs, Southeastern Community College will invite some Proponents to attend an interview. Following the interviews, the evaluation team will make a selection based on a tabulation of the evaluation sheets from all of the team members. Final results of the evaluation and selections will be presented to The Board of Trustees of Southeastern Community College for final approval.
**Source of Funds:** OSBM, USDA
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.