City of Edmond (Oklahoma) posted this IFB on Nov 20, 2026. Responses are due Dec 14, 2026. Category: Transportation & Fleet. Questions are due 2026-12-04 17:00. Solicitation number B27-013.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Solicitation to Bid to the City of Edmond for This specification is to set forth the specific requirements for (1) New (Current Year Model) 48 Foot Sheave Height Digger Derrick Mounted on appropriate cab and chassis.
An order(s) will be awarded to one or more vendors by item or groups of items whose bid(s) is (are) considered to be in the best interest of the City, as determined by City of Edmond.
The City of Edmond would appreciate the bidder offering the same contract terms and conditions to other political sub-divisions.
This (1) New (Current Year Model) 48 Foot Sheave Height Digger Derrick mounted on appropriate cab and chassis shall be to the manufacturer's standard. It shall be equipped with the manufacturer's equipment and accessories which are included as standard in the advertised and published literature for the unit. No such item of equipment or accessories shall be removed or omitted for the reason that it was not specified in the bid.
Performance Ranges:
New (Current Model Year) Freightliner Model Cab and Chassis. 4 x 4 Configuration with straight frame. Gross Vehicle Weight Rating: 35,000 pounds. Derrick shall be in compliance with ANSI A10.31 - 1995 standards in effect at time of manufacture.
All bids shall be electronically submitted no later than the closing date and time at the following link: https://edmondok.ionwave.net/Login.aspx
Bids received AFTER the time set for receipt of bids WILL NOT BE CONSIDERED. Only bids electronically submitted via the City's online bidding system are acceptable. A completed *Non-Collusion* form is **required** and must be uploaded with your bid response.
Bids submitted must remain in effect for a period of thirty (30) days after the closing date. An award will be signed and issued within that time or at a negotiated later date.
Preference shall be given to digger derrick device, which is designed and constructed within ISO 9001 certified facilities. Preference shall be given to those bids with the timeliest delivery schedule.
If the Contractor fails to deliver the completed unit within the time specified in the contract, the amount of **$150.00** per calendar day (to a maximum of the contract price) will be deducted from the monies due the Contractor.
This contract shall be in force until the expiration date or until thirty (30) days after notice has been given by either party of its desire to terminate the contract.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.