Clackamas County (Oregon) posted this RFQ on Nov 12, 2026. Responses are due Dec 16, 2026. Category: Parks & Recreation. Solicitation number S-C01010-00018407.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The North Clackamas Parks and Recreation District (NCPRD) is undertaking improvements to the Mill Park playground (located at 6201 SE Overland St. Milwaukie, OR), including replacement of play equipment and surfacing. NCPRD will procure new playground equipment and synthetic turf surfacing materials under a separate contract. This RFQ seeks a qualified contractor to perform demolition, site preparation, and installation of District provided equipment and surfacing.
2.1 Demolition
2.2 Site Preparation
2.3 Installation of District-Provided Playground Equipment
2.4 Installation of District-Provided Synthetic Turf Surfacing
2.5 Project Closeout
SUBMIT QUOTES VIA EQUITY HUB’S BID LOCKER LOCATED AT https://bidlocker.us/a/clackamascounty/BidLocker.** **EMAIL SUBMISSIONS WILL NOT BE ACCEPTED.
All quotes are binding upon Quoter for sixty (60) days from the Quote Due Date/Time. Quotes received after the Quote Due Date/Time may not be considered.
Attendance at a **Mandatory** Pre-Quote Walkthrough is **required** to be eligible to quote on this opportunity. Attendance will be documented through a sign-in sheet.
Prevailing Wage Rates requirements apply to this project because the maximum compensation for all owner-contracted work is more than **$50,000**. The selected contractor and all subcontractors shall comply with the provision of ORS 279C.800 through 279C.870, relative to the Prevailing Wage Rates and the required public works bond.
Performance and payment bonds will be required part of the final contract. Should quotes exceed **$100,000**, a bid bond must accompany submitted quote.
Project Estimate: **$80,000.00**
Project start date: Upon issuance of Notice to Proceed ("NTP"). Final Completion: June 30, 2027.
The quote received from the lowest responsive responsible Quoter will be awarded a contract.