Public Affairs Printing Services

Active 2026-196 IFBMarketing & CommunicationsPittsburgh Water and Sewer Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Pittsburgh Water and Sewer Authority (Pennsylvania) posted this IFB on Nov 17, 2026. Responses are due Dec 8, 2026. Category: Marketing & Communications. Solicitation number 2026-196.

Solicitation details

General information

Solicitation number
2026-196
Notice type
IFB
Place of performance
Pennsylvania

Agency and category

Agency
Pittsburgh Water and Sewer Authority
Category
024Marketing & Communications
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Pittsburgh Water values its relationship with a local printing partner that consistently delivers high-quality materials to support our internal and external communication needs. [...] The following Scope of Work outlines Pittsburgh Water’s expectations for a successful partnership and working relationship.

The selected vendor should demonstrate experience providing printing, mailing, signage, and related services for public agencies, utilities, municipalities, or similarly complex organizations.

Scope

Quality Standards

All printed materials shall be produced in a professional manner consistent with industry standards. The vendor shall maintain procedures for quality control and color accuracy consistent with Pittsburgh Water's brand standards and shall provide digital or hard-copy proofs for approval prior to production, as requested.

Rush/Emergency Services

Pittsburgh Water may require expedited production and delivery for urgent customer communications, operational notices, regulatory notifications, or emergency response activities. The selected vendor should be capable of accommodating such requests when feasible.

The selected printer must be able to accommodate:

  • Designate a primary account representative.
  • Respond to quote requests within one business day whenever possible.
  • Provide project status updates for larger or time-sensitive jobs.
  • Provide digital proofs prior to production.
  • Conduct quality checks to ensure color consistency, print accuracy, and proper finishing.
  • Notify Pittsburgh Water immediately if any production issues or delays arise.
  • Deliver materials to Pittsburgh Water offices and project sites within the city of Pittsburgh as requested.
  • Package materials appropriately to prevent damage during transit.
  • Maintain consistency with Pittsburgh Water branding guidelines, including color matching, fonts, and logo usage.
  • Protect the confidentiality of all Pittsburgh Water materials and communications.
  • Ability to handle projects ranging from small quantities to large-scale print runs.
  • Ability to produce materials ranging from standard-size printed pieces to large-format graphics and signage.
  • Ability to provide mailing services, including address printing, mail merges, mailing list management, postal presorting, and application of postage indicia when required.
  • Provide fabrication and installation of wall decals, educational displays, and outdoor construction signage as needed.
  • Provide graphic design services when requested.

Typical materials include:

  • Postcards for project meetings, community events, and promotional materials
  • Letters
  • Door hangers
  • Construction signage and installation
  • Yard signs
  • Mailing list development and mail merge services
  • Educational displays
  • Posters
  • Newsletters

Additional information

Responding vendors are asked to provide pricing for various quantities so we can better understand the economies of scale associated with larger quantities.

Preference will be given to vendors demonstrating strong customer service, quality assurance procedures, and the ability to meet tight production schedules.

Payment will be issued in accordance with Pittsburgh Water's standard payment terms, currently **net 45 days** from receipt of a complete and accurate invoice.

The vendor shall maintain appropriate safeguards to protect confidential customer, operational, and business information provided by Pittsburgh Water. Project files, mailing lists, artwork, and related materials shall not be shared with third parties without prior written authorization from Pittsburgh Water.

Documents

12 files

Subscribe to get these 12 documents.

  • Attachment 1-Debarment under Code Section 161 (1).pdf
    Download
  • Attachment 10- Schedule of Prices.xlsx
    Download
  • Attachment 2-Supplier Diversity Program.docx
    Download
  • Attachment 3-Addenda Acknowledgement Form.docx
    Download
  • Attachment 4-Reference Form Template.docx
    Download
  • Attachment 5-Statement of Environmental Law Compliance.docx
    Download
  • Attachment 6-Conflict of Interest Code of Ethics Forms FILLABLE.pdf
    Download
  • Attachment 7-Statement of Affiliations.doc
    Download
  • Attachment 8-Signature Page.docx
    Download
  • Attachment 9- Scope of Work.pdf
    Download
  • RFP LIMS.pdf
    Download
  • Submission Instructions - 2026-196.pdf
    Download

Similar open bids

In Pennsylvania

More from Pittsburgh Water and Sewer Authority

Open bids