Lower Paxton Township Authority (Pennsylvania) posted this IFB on Nov 13, 2026. Responses are due Dec 14, 2026. Category: Construction - Heavy & Civil. Questions are due Questions received less than seven days prior to the date for opening of Bids may not be answered.. Solicitation number Lower Paxton Township Authority Harrisburg, Dauphin County.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Lower Paxton Township Authority (Owner) is requesting Bids for the construction of the following Project: Colonial Park Stormwater Improvements – Area C1 R004807.0450
The Project includes the following Work:
Replacement and improvement of the existing storm sewer system, including storm sewer pipe, manholes, inlets, and endwalls; sanitary sewer lateral adjustments; pavement, curb, sidewalk, and driveway restoration; erosion and sediment control; and all associated appurtenant work.
Sealed bids are to be submitted online through PennBid. Bidders can submit, update, and withdraw bids until the date and time described in the Advertisement for Bids. All bidders shall submit all executed documents included with the bids in original form to the Owner within 3 business days of the bid opening date.
Bids for the construction of the Project will be received online, until **Monday, December 14, 2026 at 10:00 AM local time**. At that time the Bids received will be opened via PennBID and read at a Virtual Teams Meeting and results will be posted shortly thereafter on PennBID.
A Bid must be accompanied by Bid security made payable to Owner in an amount of **10 percent** of Bidder’s maximum Bid price (determined by adding the base bid and any alternates) and in the form of a certified check or a Bid bond.
All Bidders must complete and execute the enclosed *Non-Collusion Affidavit*. All Bidders are required to submit a *Public Works Employment Verification Form* as a precondition for the Contract Award.
The estimated cost for this project is greater than Twenty-five Thousand Dollars (**$25,000**) and the Pennsylvania Prevailing Wage Act shall apply.
All bids shall be irrevocable for 60 days after the bid opening date unless award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case this Bid shall remain subject to acceptance for 120 days after the bid opening date.
If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas.