The RDA is issuing this Request for Proposal (RFP) for the exterior rehabilitation of 21 N 7th Street, Easton, PA. This RFP is soliciting proposals for the selection of a contractor (hereinafter collectively referred to as “CONTRACTOR”) for the work at that property.
This project is part of the Redevelopment Authority’s Blight Remediation Program wherein slum and blighted real estate is to be rehabilitated to eliminate blighted conditions in Easton’s neighborhoods.
The property is an detached 1,600 sqft, 2.5 story, single-family, residential building with full basement in the West Ward neighborhood. The building is considered to be structurally stable. The budling has utilities and electric service. The property adjoining to the north is occupied.
The project consists of the exterior rehabilitation of 21 N 7th St, Easton, PA as described by these Drawings and Specifications, to be completed in one phase. The scope of work shall include all areas described in the supplied drawings and specified in the written project scope. [...]
In this proposal, the contractor will bid on all aspects of the exterior rehabilitation with select demolition and interior clean out as outlined in the specifications. The contractor will be responsible for all aspects of any and all subcontractors.
The Contractor shall submit a fixed price contract to provide all labor, materials and equipment required for the completion of his work as described in the Drawings and/or Specifications. Contractor shall pay all applicable taxes and fees and shall secure and pay for all permits necessary to complete the work.
Exterior demolition of the main building shall include removing all existing surfaces (roof material, siding, any remaining exterior finishes), doors and windows. [...] The entire two-story addition to the north of the main building shall be removed including steps under bulkhead door to basement. [...] The entire chimney shall be removed.
Exterior siding shall be cement fiber board 4” reveal, smooth lap clapboard siding with corner boards as indicated with a standard manufacturer’s finish. [...] New roofing shall be fiber glass composition meeting the EnergyStar® Program criteria, UL Class A fire resistance, ASTM D3462, ASTM 3018 Type 1 conforming to CSA standard A123. [...] Gutters shall be seamless 6” k style.
New windows shall be vinyl construction replacement with low-E coating (u-value of 0.30 or better). [...] Front entry door shall be pre-hung fiberglass or aluminum entry doors with ¾ lite, frosted/obscured glass with bottom raised panel.
All interior/exterior prep and painting shall be performed by a state of Pennsylvania licensed lead abatement contractor.
Bid must be submitted through the Pennbid Procurement Platform. No hard copy submissions will be accepted.
The selection of a contractor for the Property will be predicated on proposal price, the Contractor’s experience, quality of past projects, and the contractor’s proven ability to complete similar projects in a timely and professional manner.
Therefore, the proposal shall contain the following:
Contractor shall purchase and maintain such insurance as will protect him from claims which may arise out of, or result from, the Contractor’s operation under the Contract, whether such operations be by himself or by any subcontractor, or by anyone directly or indirectly employed by any of them. The Redevelopment Authority of Easton shall be named as an additionally insured by the contractor for the duration of the project.
A minimum of 10% of the contract will be held as retainage until the Contract is 100% complete, and all systems have been tested and accepted by the RDA.
Proposals may be held by the RDA for a period not to exceed ninety (90) days from the date of the opening of proposals.