VSC Phase 1 Chem Lab Relocation & Renovation Project

Active Slipper Rock University, Butler County IFBConstruction - BuildingSlippery Rock University
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Slippery Rock University (Pennsylvania) posted this IFB on Nov 16, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-12-01 11:00. Solicitation number Slipper Rock University, Butler County.

Solicitation details

General information

Solicitation number
Slipper Rock University, Butler County
Notice type
IFB
Place of performance
Pennsylvania
Questions due
2026-12-01 11:00

Agency and category

Agency
Slippery Rock University
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Slippery Rock University, of the PA State System of Higher Education invites Contractors to download bid documents for this project.

The Project renovates two existing third-floor spaces in Slippery Rock University’s Vincent Science Center into a General Chemistry Prep Room and an Autoclave Room. General construction includes selective demolition, new partitions, doors, and interior finishes. The Owner will be relocating an existing fume hood from the Advanced Technology Science Hall Building into this space. It also includes preparing the rooms for Owner-furnished and installed laboratory casework, sinks, and a safety shower/eyewash unit. For a future autoclave, the Project provides capped utility lines with isolation valves and an electrical disconnect. Related mechanical, plumbing, and electrical work includes new ceiling-suspended hoods, power upgrades, lighting, and air distribution.

Scope

Work for the Project shall be accomplished by Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General Contractor. Specific instructions for coordination and responsibilities of the Lead Prime Contractor are contained in Section 0131000, Project Management and Coordination, and elsewhere throughout the Contract Documents

Work shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all Construction to the satisfaction of the University, and subject to approval of the Professional and State System of Higher Education.

Contract Cost Ranges

  • UP-2025-026.1 General Construction $40,000.00 to $50,000.00
  • UP-2025-026.2 Mechanical Construction $40,000.00 to $50,000.00
  • UP-2025-026.3 Plumbing Construction $20,000.00 to $25,000.00
  • UP-2025-026.4 Electrical Construction $25,000.00 to $30,000.00

Bid Alternates (General Construction)

  • ALTERNATE BID NO. 1 (Resinous Flooring): State the amount to be ADDED to the Contract to provide all General Construction labor and materials to install resinous flooring and base in Room Nos. 306 and 307 in lieu of the floor finish as provided for in the base bid of vinyl composition tile and vinyl base as provided in base bid.
  • ALTERNATE BID NO. 2 (Sheet Vinyl Flooring): State the amount to be ADDED to the Contract to provide all General Construction labor and materials to install sheet vinyl flooring and base in Room Nos. 306 and 307 in lieu of the floor finish as provided for in the base bid of vinyl composition tile and vinyl base as provided in base bid.

Additional information

**Method of submission of bids:** by upload of electronic documents to PennBid Bonfire Bid Event. Bidders must obtain all bid documents from the PennBid Bonfire Bid Event and not other bid exchanges to be eligible to submit a bid proposal.

**Items Required to be Submitted with the Bid:** *Bid Form* & Contractor Qualifications

Bids shall be valid for not less than 60 days.

**Bid Security Required:** None

**Performance & Payment Bond Required with the Contract:** 100% of awarded Contract Price

**Maintenance Bond required with contract:** 10% of awarded contract price

The System intends to award a contract or contracts resulting from this IFB to the responsible bidder(s) who submitted a responsive bid(s) which represents the lowest price to the System based on the bid evaluation plan.

This Project is subject to the Pennsylvania Prevailing Wage Act, 43 P.S. § 165-1 et seq, as amended. The Prevailing Minimum Wage Determination for this Project is Serial Number 26-09864, determined November 16, 2026, and consisting of 6 pages.

**Site Visits:** Immediately following the pre-bid meeting.

Documents

11 files

Subscribe to get these 11 documents.

  • Electrical Bid Form
    Download
  • 71-FA-8.2 Dec 2023.pdf
    Download
  • Gen Instr to Bidders 71-FA-8.2 Dec 2023.pdf
    Download
  • General Bid Form 71-FA-8.2 Dec 2023.pdf
    Download
  • Mechanical Bid Form
    Download
  • 71-FA-8.2 Dec 2023.pdf
    Download
  • Plumbing Bid Form
    Download
  • 71-FA-8.2 Dec 2023.pdf
    Download
  • Spec Instr to Bidders 71-FA-8.2 Dec 2023.pdf
    Download
  • SRU VSC Chemistry Prep Renovation Bid Set Drawings 20261113.pdf
    Download
  • UP-2025-026 VSC Phase 1 Chem Lab Relocation Renovation Project Bid Package.pdf
    Download

Similar open bids

In Pennsylvania