Modular Office Building

Active 12891AP IFBConstruction - BuildingClemson University
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Clemson University (South Carolina) posted this IFB on Nov 19, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Solicitation number 12891AP.

Solicitation details

General information

Solicitation number
12891AP
Notice type
IFB
Place of performance
South Carolina

Agency and category

Agency
Clemson University
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Clemson University seeks a Contractor to provide, deliver, and install a modular office building. This is a one-time purchase and will be awarded to one Offeror. The modular office buildings shall be delivered and installed in Clemson, SC. Delivery to be coordinated with site preparation.

Scope

Modular buildings must be new. [...] CONTRACTOR shall provide one (1) modular office 24’ x 60’. See IV Appendice to Scope of Work A, Floor Plan.

  • The modular office shall have two (2) restrooms.
  • The modular office shall have one (1) office space.

CONTRACTOR shall be responsible for designing and constructing the modular offices and installing on location as turnkey operation. The turnkey operation includes supporting the units, tie-downs, strapping, transporting the unit to the site, and setting on supports.

CONTRACTOR shall also provide the following:

  • Pier Plans prepared by a South Carolina licensed engineer;
  • Tie Down Plans;
  • Building Plans including Floor, Roof, Structural, all Exterior Elevations, all Wall Sections, Mechanical, Plumbing and Electrical;
  • Plot Plans
  • Specifications including Shop Drawings (signed and sealed by a S.C. Professional engineer);
  • Product Data Sheet(s): provide a complete list of all material(s) with descriptive data, erection and installation;
  • Warranty: provide certificate depicting warranty condition;
  • Maintenance: provide bound manuals containing instructions published by manufacturer on manufacturer’s care and distribution; and Product Certificates with names and address of manufacturer and identifying number;
  • Training/tutorials on modular office care and operation
  • Footings as per structural engineer
  • Removal of hitches and stored under the unit

All work should comply, as applicable, with the S.C. Code 23-43-10 et. Seq, “South Carolina Modular Buildings Act.” All modular units are to be able to be relocated and movable. Modular offices must meet ADA requirements, meet the state and local codes, and conform to other specifications. EXTERIOR RAMPS AND STAIRCASES ARE EXCLUDED FROM THE CONTRACTORS SCOPE. THESE WILL BE CONSTRUCTED BY OWNER (SEE L3). The CONTRACTOR will be responsible for storage and security of the modular units until OWNER takes possession.

Utilities: Owner shall provide electrical distribution panels.

After award, all equipment deliveries shall be made and all services provided to the following address unless otherwise specified: CSM XL Yard, 170 Hugo Dr. Seneca, SC 29678

Additional information

Offerors are required to submit their proposal electronically through the Clemson University online bidding system. To do so, you must log in (registering first) at https://clemson.ionwave.net/Login.aspx and follow specific instructions for this solicitation. You should register several days in advance of the bid closing date so you can be approved and login in time to submit a response.

The successful Offeror must be an active supplier in Clemson University’s Workday system. If the Offeror is not an active supplier, the Offeror agrees to complete their supplier registration within three (3) business days of receiving an email invitation to register.

The successful Offeror shall provide satisfactory evidence of all required insurance coverage and licenses PRIOR TO PERFORMANCE or AS PART OF TECHNICAL PROPOSAL.

No performance and payment and/or a bid bond requirements.

Offerors must submit pricing in the online bidding system. Pricing will be consist of modular office pricing, delivery and labor. Modular office pricing must include all costs, and fees less labor, tax and freight. To include but not limited to building, materials, warranty, etc. No other costs will be considered.

Warranty & service information must be submitted as part of the bid.

Documents

3 files

Subscribe to get these 3 documents.

  • IMPORTANT TAX NOTICE.doc
    Download
  • Bidding-Terms and Conditions Revision G 2025.12.15.pdf
    Download
  • Scope of Work - 12891AP.pdf
    Download