ANNOUNCEMENT: Notice of Competitive Sealed Proposal (CSP) #910-27-287-00-S-AB-CSP Follow Solicitation

Active 910-27-287-00-S-AB-CSP RFPConstruction - BuildingAustin Community College District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Austin Community College District (Texas) posted this RFP on Nov 13, 2026. Responses are due Dec 10, 2026. Category: Construction - Building. Questions are due 2026-12-01 12:00. Solicitation number 910-27-287-00-S-AB-CSP.

Solicitation details

General information

Solicitation number
910-27-287-00-S-AB-CSP
Notice type
RFP
Place of performance
Texas
Questions due
2026-12-01 12:00

Agency and category

Agency
Austin Community College District
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

AUSTIN COMMUNITY COLLEGE (ACC) DISTRICT is soliciting Competitive Sealed Proposals (CSP) from qualified and interested firms for restroom renovations within Buildings 1000 and 2000 at the Northridge Campus in accordance with Northridge Campus (NRG) Restroom Renovations for Buildings 1000 and 2000 #910-27-287-00-S-AB-CSP.

ACC's objective of this solicitation is to award one (1) contract with a professional and qualified General Contractor (GC) firm to renovate three (3) existing restrooms within Northridge Campus Building 1000; four (4) existing restrooms within Building 2000; and the conversion of one (1) selected office space into an accessible single-user gender-neutral restroom in Building 2000. The total number of all restrooms is eight (8). This project will improve accessibility, provide compliance for the Americans with Disabilities Act (ADA) and the Texas Accessibility Standards (TAS), and ensure statutory compliance with the Texas Senate Bill 8 (SB8) 2025 requirements.

Scope

The modifications and replacements must include, but are not limited to, plumbing fixtures, restroom accessories, isolation valves, hardwired sensor faucets, manual dual-flush valves, and trough-style lavatories where indicated.

Accessibility improvements must include, but are not limited to, door modifications, automatic door operators, restroom vestibule modifications, and all related hardware associated with these improvements. New installations will be required for toilet partitions, hand dryers, signage, tile, and finish repairs.

The selected/awarded GC firm shall implement the phasing shown on Sheet G0.03 [...], and construction phasing must follow the order listed below:

1. Phase 1 must begin with the water submeter and isolation valve installations necessary to support construction by floor;
2. Phase 2 will follow with the second-floor restroom work; and,
3. Phase 3 will address all of the remaining first floor work.

Building 1000

1. Renovation of the existing first and second-floor restroom areas shown in the contract documents.
2. Accessibility modifications and fixture adjustments or replacements.
3. New toilet partitions, restroom accessories, hand dryers, faucets, and related improvements.
4. Plumbing modifications and new isolation valves to support the renovated restroom groups.
5. Ceiling, lighting, and finish repairs associated with the renovation.

Building 2000

1. Renovation of the existing first and second-floor restroom areas shown in the contract documents.
2. Accessibility modifications and fixture adjustments or replacements.
3. Removal of approved redundant interior vestibule doors while maintaining required corridor facing rated doors.
4. Repair and replacement of automatic door operators as indicated.
5. Construction of a new accessible single-user restroom within existing Room 2132, with the remaining area to be maintained for storage.
6. Plumbing modifications, new isolation valves, and replacement of deteriorated exterior building shutoff valves as indicated.
7. Ceiling, lighting, and finish repairs associated with the renovation.

The estimated construction budget is **$990,000**.

Additional information

Please complete the following components of your bid submission included in this digital CSP event:

  • WSS Questionnaire
  • Pricing worksheet: *Exhibit J – Pricing Response Sheet* - Excel Version
  • Required documents, including the *Certification Form (Exhibit A)*, SBDP Forms (Exhibits B-1, and/or B-2), *Affidavit of Non-Collusion (Exhibit C-1)*, *Conflict of Interest Questionnaire (Exhibit C-2)*, *Exhibit E*, proof of insurability, evidence of licensure, and signed addenda.

ACC will evaluate proposals in accordance with the Texas Education Code Section 44.031(b), Texas Government Code Section 2155.074 and ACC's best value criteria:

1. Total overall proposal cost (25%);
2. Quality, reliability, and successful experience of the respondents past performance (25%);
3. Specific project plan, construction schedule, and logistics plan for this renovation project (25%);
4. Personnel and Resumes (10%);
5. Safety Record (10%); and,
6. Business Organization and Litigation (5%).

The maximum percentage points that can be awarded to a respondent for SLBE participation is ten (10) percentage points.

The anticipated dates are as follows:

  • Notice to Proceed: March 11, 2027.
  • Field Mobilization: April 8, 2027.
  • Substantial Completion must be achieved by July 28, 2027.
  • Final Completion must be achieved by August 25, 2027.

Liquidated damages: Overall Substantial Completion delay: **$500 per calendar day**.

Until Substantial Completion, ACC will pay 95% of the amount due to the awarded contractor on account of progress payments, but will retain five percent (5%) of the original amount.

General Liability Insurance: Policy aggregate **$2,000,000**; Each occurrence **$1,000,000**.

ACC will host an optional site visit immediately following the solicitation conference, at 10:00 a.m., CST, in Room #2119 of Building 2000, 11928 Stonehollow Drive, Austin, Texas 78758.

Documents

1 file

Subscribe to get this document.

  • ESBD_576108_1794597894734_7 - Final solicitation.pdf
    Download

Similar open bids

In Texas