Competitive Sealed Proposal (CSP) for Mechanical, Electrical, and Plumbing (MEP) Renovations at Boone Elementary School - (Estimated Budget $1,300,000.00)

Active 27CSP034 RFPConstruction - BuildingAustin Independent School District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Austin Independent School District (Texas) posted this RFP on Nov 20, 2026. Responses are due Dec 15, 2026. Category: Construction - Building. Questions are due 2026-12-04 16:00. Solicitation number 27CSP034.

Solicitation details

General information

Solicitation number
27CSP034
Notice type
RFP
Place of performance
Texas
Questions due
2026-12-04 16:00

Agency and category

Agency
Austin Independent School District
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Austin Independent School District ("AISD" or "District") is seeking proposals from qualified contractors to provide Mechanical, Electrical, and Plumbing (MEP) Renovations at Boone Elementary School. The Project scope will focus on mechanical, electrical, and plumbing infrastructure upgrades designed by Perkins Eastman and Halff Associates.

Funding for the Project is provided through the 2022 Bond Program. The estimated construction budget for this solicitation is approximately **$1,300,000.00**.

This procurement is being conducted using the Competitive Sealed Proposal (CSP) method in accordance with Texas Government Code Chapter 2269. The District will select the proposer that offers the best value based on the published evaluation criteria.

Scope

The Contractor shall provide all labor, materials, equipment, supervision, and incidentals required to complete the Work in accordance with the Contract Documents, including drawings, specifications, and applicable codes.

The Project consists of Mechanical, Electrical, and Plumbing (MEP) Renovations at Boone Elementary School, located at 8101 Croftwood Dr, Austin, TX 78749. The Work includes, but is not limited to:

1. Mechanical Work (HVAC)

  • Auxiliary Building Upgrades: Replacement of 9 existing ground-source heat pumps with new water-source heat pumps
  • Condenser Pipe Loop: Installation of a new condenser pipe loop routed to the Auxiliary Building to serve the new water-source heat pumps
  • Kitchen HVAC Upgrade: Replacement of the existing 7.5-Ton heat pump serving the kitchen
  • Unit Heater Replacement: Replacement of a 40 MBH gas unit heater with an electric unit heater
  • Controls & Automation: Implementation of a direct digital control (DDC) building automation system (Tridium-BACnet) with field-installed controls, sensors, actuators, and graphical integration

2. Plumbing Work

  • Water Heater Replacement: Demolition and replacement of existing electric water heaters (including two 2.5-gallon units and one 30-gallon unit) located in custodial closets
  • Domestic Water Systems: Installation of associated piping, insulation, expansion tanks, and recirculating pumps

3. Electrical Work

  • Power Distribution: Design, supply, and installation of power connections, raceways, conductors, and disconnect switches serving the newly installed mechanical and plumbing equipment
  • Panelboard Replacement: Demolition of the existing panelboard in the Auxiliary Building and installation of a new 200A panelboard, re-terminating existing branch circuits and installing a new feeder/tap

4. Structural & Building Envelope / Roofing Work

  • Roof Penetrations & Support: Structural core drilling, wall penetrations, and proper roof sealing/support installations for outdoor condensing units and rooftop refrigerant piping runs
  • Pipe Traverses: Routing overhead and trench/crawlspace pipe supports, hangers, and structural attachments between the main building/central plant and the Auxiliary Building

5. Testing, Commissioning & Closeout

  • Testing, Adjusting, & Balancing (TAB): Air and hydronic system balancing and report generation for all new equipment
  • Building Commissioning (Cx): Formal commissioning verification across plumbing, mechanical, and electrical systems in coordination with the Owner’s Commissioning Authority
  • Indoor Air Quality & Waste Management: Strict compliance with AISD IAQ controls during construction, as well as a minimum 75% waste diversion requirement from landfills

All Work shall be performed in accordance with the Issue for Construction (IFC) Project Drawings and Project Manual, dated September 30, 2026, which are included as part of this solicitation. The Substantial Completion Date for all work is July 30, 2027.

Additional information

Submission

Proposals must be submitted electronically through the AISD Bonfire Portal no later than **2:00 PM (CST)** on the proposal due date. Late submissions will not be accepted. Only proposals submitted through Bonfire will be considered. All questions must be submitted through the AISD Bonfire Portal.

Evaluation

The contract will be awarded to the proposer that offers the best value to the District.

  • Price (40 points)
  • Experience(s) (20 points)
  • Quality of Services / Proposal (10 points)
  • Safety (5 points)
  • Personnel (10 points)
  • Small Business (SB) Program (15 points)

Bonds and Insurance

Each Proposal must be accompanied by a Proposal Guaranty in the amount of five percent (5%) of the largest possible total Proposal. If the Contract amount exceeds $100,000, the selected Proposer shall provide both a Performance Bond and Payment Bond. Each bond shall be in the amount of one hundred percent (100%) of the Contract Price and shall be issued by a corporate surety authorized to do business in the State of Texas. Insurance meeting the requirements set out in the General Conditions shall be provided prior to commencement of Work.

Other

Proposals shall remain valid for a period of 120 calendar days from the proposal due date. A 20% Small Business Program (SB) participation goal has been established for this construction contract. A site visit has been scheduled for Tuesday, December 1, 2026 at 1:00 PM at the following location: Boone Elementary School - 8101 Croftwood Dr, Austin, TX 78749.

Documents

14 files

Subscribe to get these 14 documents.

  • 27CSP034 MEP Renovations at Boone Elementary School Solicitation Document.docx
    Download
  • 27CSP034 Project Drawings.pdf
    Download
  • 27CSP034 Project Manual.pdf
    Download
  • Appendix 1 - Purchasing and Acquisition Vendor Relations Policy CHE-LOCAL accessible.pdf
    Download
  • Appendix 2 - Austin ISD Policy and Provisions REVISION 1-10-20.pdf
    Download
  • Attachment A – Addenda Acknowledgement.pdf
    Download
  • Attachment B- Safety Documents.pdf
    Download
  • Attachment C-1 Small Business Enterprise Participation Report.xlsx
    Download
  • Attachment C-2 Small Business Enterprise Program Participation Plan.pdf
    Download
  • Attachment C-3 Small Business Enterprise Program Compliance Guidelines.pdf
    Download
  • Attachment D – Notice of Prevailing Wage Rates.pdf
    Download
  • Attachment E – Required Forms.pdf
    Download
  • CONSTRUCTION FORM AISD GCC (Rev. 2022 Bond Projects) 08.18.2026 (SBP version) 2.docx.pdf
    Download
  • Exhibit A.1 AISD 2022 Bond Minimum Wage Clarifications.pdf
    Download