Economic Analysis-Valuation of Water Rights for Forbearance Follow Solicitation

Active 003-26-EXE RFPProfessional ServicesEdwards Aquifer Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Edwards Aquifer Authority (Texas) posted this RFP on Nov 9, 2026. Responses are due Dec 2, 2026. Category: Professional Services. Questions are due 2026-11-24 15:00. Solicitation number 003-26-EXE.

Solicitation details

General information

Solicitation number
003-26-EXE
Notice type
RFP
Place of performance
Texas
Questions due
2026-11-24 15:00

Agency and category

Agency
Edwards Aquifer Authority
Category
003Professional Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Edwards Aquifer Authority (EAA), located in San Antonio, Texas, is soliciting proposals for the performance of an economic analysis and valuation of a withdrawal suspension program associated with the use of Edwards Aquifer Groundwater Rights.

The EAA is seeking an economic analysis of the value of forbearance of the use of Edwards Aquifer Groundwater withdrawal rights. For the past 13 years, the EAA has administered two forbearance programs where it contracts with Edwards Aquifer Groundwater Withdrawal Rights (Water Rights) holders for the suspension of their Water Rights during certain, defined environmental conditions related to drought. The EAA intends to update these programs over the next year and is seeking to understand the appropriate value to be assigned to the contracted Water Rights.

Scope

The objective of this project is to determine a fair market scale for pricing the cost of securing forbearance rights to Edwards withdrawal permits (Water Rights or Rights) over various identified periods of time (contract terms).

Ultimately, the EAA seeks to administer a program through contractual agreements that provide Water Rights owners yearly compensation for the right to control and forbear their Rights under certain aquifer conditions that may occur over the span of 5 or 10 year agreements. As envisioned, participants in this forbearance program would be entitled to continue to utilize their Water Rights in years when forbearance is not required.

The EAA requests the following tasks be completed for this project:

1. An economic analysis of the current market value for Edwards Aquifer Water Rights for both irrigation and municipal/industrial uses;
2. A corresponding analysis of the current market value of irrigation Water Rights relative to their agricultural use for crops in the Edwards Region (e.g., what is the value of the water when applied to its most beneficial agricultural use);
3. Once market values have been established, an analysis that considers how that value should be applied to establish an appropriate price point for securing the Water Rights that are to be the subject of future forbearance program contracts (to help with the analysis, using historic data, the EAA will provide information on how often the environmental conditions that would require forbearance under the contracts have occurred); and
4. An analysis and projection that quantifies how the values provided in 1-3 above are likely to change over the next thirty (30) years.

Additional information

Submission method

Offerors may provide electronic or physical submissions of proposal responses as follows:

  • Electronic: The EAA partnered with the Texas Purchasing Group for receipt of electronic proposals via BidNet. Please register on BidNet to access the proposal request and to submit electronic submission documents. Please note, a paid subscription to BidNet is not required to access proposals or submit responses: (https://www.bidnetdirect.com/texas/edwardsaquiferauthority)
  • Physical: Submit one (1) printed original and one (1) electronic copy on a USB thumb drive of the proposal responses, sealed with "RFP NO. 003-26-EXE" indicated on the top of the envelope, to: Ms. Shelly Hendrix, Sr. Director/CFO, Edwards Aquifer Authority, RFP NO. 003-26-EXE, 900 E. Quincy Street, San Antonio, Texas 78215

Proposal responses submitted must contain, at a minimum, the following: *Proposal Summary* (Attachment A1); *Cost Proposal Summary* (Attachment A2); *Client Reference forms* (Attachments B1-B3); *Project Subcontracting Plan* (Attachment A4).

NO FACSIMILE OR EMAIL PROPOSALS WILL BE ACCEPTED.

PROPOSALS RECEIVED AFTER THE DEADLINE WILL NOT BE ACCEPTED BY BIDNET AND WILL BE RETURNED, UNOPENED, IF PHYSICALLY SUBMITTED.

**Selection criteria** (listed in order of importance):

  • Commercial Quality & Responsiveness (45 points)
  • Cost Factors (40 points)
  • Project Subcontracting Plan (10 points)
  • Financial Stability (5 points)

This project will be awarded as a time-and-materials, not-to-exceed an agreed upon total Contract amount.

All prices and conditions of the proposal shall remain in effect for ninety (90) days after the date set for the proposal opening. Proposals offering less than ninety (90) calendar days for acceptance by the EAA from the date set for opening will be considered nonresponsive and will be rejected.

Documents

1 file

Subscribe to get this document.

  • ESBD_574210_1793916928146_RFP 003-26-EXE Economic Analysis-Valuation of Water Rights for Forbearance.pdf
    Download

Similar open bids