Hazardous Abatement Services

Active RFP 745-27-P17 RFPEnvironmental ServicesThe University of Texas Health Science Center at San Antonio
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

The University of Texas Health Science Center at San Antonio (Texas) posted this RFP on Nov 23, 2026. Responses are due Dec 18, 2026. Category: Environmental Services. Questions are due 2026-12-07 17:00. Solicitation number RFP 745-27-P17.

Solicitation details

General information

Solicitation number
RFP 745-27-P17
Notice type
RFP
Place of performance
Texas
Questions due
2026-12-07 17:00

Agency and category

Agency
The University of Texas Health Science Center at San Antonio
Category
008Environmental Services
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The University of Texas Health Science Center at San Antonio (University) is soliciting proposals from qualified contractors to perform HAZARDOUS ABATEMENT SERVICES (Work) more specifically described in Section 5.4 (Scope of Work) of this Request for Proposal (RFP).

Scope

Contractor shall provide all Supervision, Labor, Tools, and Equipment necessary to perform various sizes and scopes of work of commercial Hazardous Abatement Services to University on an "as needed" basis.

Contractor is required to hold all licensing as required by the Texas Dept. of State Health Services (DSHS) and Texas Department of Licensing and Regulation (TDLR). Hazardous Abatement Services includes but, not limited to: Abestos Abatement, Mold Remediation and, Lead Paint Abatement,

University reserves the right to request: (1.) Labor Only; OR; (2.) Labor and Material from Contractor.

Contractor shall be responsible for field verifications and material take-offs prior to beginning any work. Contractor shall submit their written cost proposal and estimated completion time to the University's designated representative for approval then, Contractor will receive a Purchase Order authorizing Contractor to proceed with the work.

Contractor shall coordinate all work schedules with the University's designated representative and submit invoices to the University's designated representative upon completing any assigned work. [...] Contractor Supervision is required at all work sites at all times. [...] Contractor shall keep a clean work area, remove all trash at the end of each work day and properly dispose of in a container specified by the University's designated representative.

Work hours are job specific. Depending on the type and location of the work area, work may be required during regular working hours (M-F, 7am to 5pm), after 5pm and/or Saturday and Sunday and holidays. In the event of an emergency, a timely response is required from the Contractor.

Contractor shall be responsible for providing all tools and equipment as required to successfully perform and complete commercial Hazardous Abatement Services for the University. [...] Contractor shall be responsible for providing all personal protection equipment (PPE) as required to safely perform and complete commercial Hazardous Abatement Services for the University. Contractor shall comply with OSHA and local, state and, federal safety requirements.

University will be responsible for coordinating and funding all State of Texas notifications in order to commence Hazardous Abatement Services. In addition, University will be responsible for coordinating any necessary air monitoring services during the abatement process.

Additional information

University will receive Proposals via Bonfire, the University's online proposal and bid submission system. **Proposal Submittal Deadline: Friday, December 18, 2026; 3:00 pm CST**.

A Subcontracting Plan (SP) is a **required** part of the proposal and is submitted via Bonfire by the same deadline.

Scored Criteria

  • Cost of goods and services (50%)
  • Proposer's Experience in Providing Hazardous Abatement Services for an Institution of Higher Education and/or a Healthcare Environment (20%)
  • Proposer's Ability to Perform Hazardous Abatement Services (10%)
  • Proposer's Qualification of Staff Performing Hazardous Abatement Services (10%)
  • Proposer's exceptions to the terms and conditions set forth in Section 4 of this RFP (10%)

Each proposal must remain valid for University's acceptance for a minimum of ninety (90) days after the Submittal Deadline.

Contractor shall maintain and provide evidence of insurance coverage for the duration of the Hazardous Abatement Services contract. Contractor shall be financially capable to undertake multiple projects of any size and scope and be able to provide payment bonds and performance bonds upon request by University.

University anticipates that the term of the Agreement may be up to two (2) years with the initial term of the Agreement proposed to begin upon a fully executed Agreement. The University may elect to renew the Agreement for an additional two (2) years.

Documents

6 files

Subscribe to get these 6 documents.

  • Appendix One - Proposal Requirements.pdf
    Download
  • Appendix Three - Subcontracting Plan.pdf
    Download
  • Appendix Two - Sample Agreement.doc.pdf
    Download
  • RFP 745-27-P17
    Download
  • Hazardous Abatement Services.pdf
    Download
  • Section 6 - Pricing Delivery Schedule.pdf
    Download

Similar open bids

In Texas

More from The University of Texas Health Science Center at San Antonio

Open bids