University Health (Texas) posted this RFP on Nov 20, 2026. Responses are due Dec 21, 2026. Category: Construction - Building. Solicitation number RFCSP-226-09-089-CNST.

Solicitation details

General information

Solicitation number
RFCSP-226-09-089-CNST
Notice type
RFP
Place of performance
Texas

Agency and category

Agency
University Health
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Bexar County Hospital District /dba/ The University Health, is soliciting sealed bids for MacArthur Plaza Clinic, located at 3131 Nacogdoches Road, San Antonio, Texas 78217.

The area of work shall include, but not be limited to, the complete demolition of the existing vacant retail space, formerly occupied by a pet store, encompassing approximately 8,380 square feet.

Scope

The General Contractor shall be responsible for all work and associated outlined in the project scope, specifications, and reference drawings. All construction activities shall be carefully coordinated to minimize noise and disruption to adjacent areas and maintain a safe and functional environment.

The General Contractor shall anticipate the need for after-hours and/or weekend work as necessary to accommodate facility operations and complete the project within the required schedule.

This overview is intended to provide a general summary of the project. The complete scope of work, specifications, and reference drawing shall govern all construction requirements.

The area of work shall include, but not be limited to, the complete demolition of the existing vacant retail space, formerly occupied by a pet store, encompassing approximately 8,380 square feet.

Following the demolition, the General Contractor shall complete the interior build-out of the space to accommodate the new clinical facility. The proposed work shall include, but not be limited to, the construction and installation of the following areas:

  • Five (5) Pediatric Examination Rooms
  • Twelve (12) Adult Examination Rooms
  • Main Waiting Room and Reception Area
  • Five (5) Toilet Rooms
  • Break Room
  • Medication Room
  • Clean Linen Storage Area
  • Biohazard Room
  • Treatment Room
  • IDF Room build-out
  • Ultrasound Room

Additional information

Contractors shall break down their BASE PROPOSAL amount on Section 00003A *Proposal Form Attachment* and submit with *Proposal Form* at time of SUBMITTAL.

A cashier's check or bid bond in the sum of **five percent (5%)** of the amount of contractor's proposal price is attached to this Proposal as a guarantee of the execution of a satisfactory contract and the furnishing of bonds as specified.

The undersigned agrees, if awarded the Contract, to execute and deliver to the Owner, within ten (10) days, a PERFORMANCE BOND PAYMENT BOND in the form prescribed by the Contract Documents, signed by himself as Principal, and by an established reputable Bonding or Insurance Company (satisfactory to the Owner), in the penal sum of **100%** of the contract until acceptance of the work by the Owner.

This proposal shall remain in effect for a period of one-hundred twenty (120) days from the date of submission.

Contract Time means the period of time, including any authorized adjustments, allotted in the Contract Documents for Substantial Completion of the Work, which shall occur no later than **March 31, 2027**.

Warranty Expiration, Scheduled Date of - shall mean Twelve (12) Months from the scheduled date of Substantial Completion, as established in the Project Schedule and the Construction Schedule.

Documents

6 files

Subscribe to get these 6 documents.

  • 1 - RFCSP-226-09-089-CNST McArthur Plaza Clinic Master Solicitation Template.docx
    Download
  • Exhibit A - University Health Owner-Contractor Agreement.docx
    Download
  • Exhibit B - Bid Bond Form.docx
    Download
  • Exhibit C - UH Front End Specifications.pdf
    Download
  • Exhibit D - Construction Drawings.pdf
    Download
  • Exhibit E - Addendum 1 to Construction Documents.pdf
    Download

Similar open bids

In Texas