The Houston-Galveston Area Council (H-GAC) has established a partnership with the East End District of Houston, Texas, to conduct a comprehensive, Boulevard Corridor Study (Approx 1.5 miles). The Navigation Boulevard Corridor Study will affect an approximate 6,500 residents. The goal of this study will assess current and future transportation needs along the Navigation Boulevard Corridor, identify practical ways to improve multimodal accessibility, reduce congestion, positively impact air quality and expand travel options to create a more connected network, support growth in the Navigation Boulevard and East End District, and include robust public outreach and engagement to identify transportation priorities and recommendations within the study area with guidance from the local community and relevant agencies.
Note: This is a planning study; no engineering services or stamped drawings are required.
Task 1 - Project Management and Coordination
Prepare a Project Management Plan (PMP) describing the overall approach and methodology to complete the Corridor Study. This includes identifying work organization, responsibilities, coordination / communication procedures, and quality assurance and quality control procedures.
Progress reports, and updated project schedules must be submitted to H-GAC's Project Manager monthly and are required regardless of if Contractor submits an invoice for that month. Coordinate bi-weekly project update meetings (in person or via conference call) with H-GAC to discuss outstanding issues and necessary preparations for upcoming events and activities.
Deliverables:
1. Project Management Plan within 30 days of Contract execution date
2. Monthly Invoices
3. Monthly progress reports
4. Project schedule (Gantt Chart) updated as needed
5. Copy of subcontractor contracts within 30 days of execution
6. QA/QC plan
Task 2 - Public Outreach
Based on the H-GAC Public Participation Plan (PPP), develop an ongoing Public Outreach Program and assist in executing outreach activities by recommending the appropriate number and types of meetings to successfully carry out a thorough public outreach program throughout the duration of the study. Develop and submit a Public Involvement Plan (PIP) within 45 days of contract execution date.
Steering Committee (minimum of three) meetings will be held with additional meetings scheduled as needed. Public Meetings (minimum of two) as required by H-GAC PPP, to be held at key milestones during the study.
Task 3 - Existing Conditions Analysis
Using the collected data, analyze and document existing transportation, traffic, safety, land use, demographic, drainage conditions, and multimodal conditions within the study area.
Task 4 - Needs Assessment and Opportunity Analysis
Using the findings from Task 3, the Contractor will identify and assess transportation needs, issues, opportunities, and constraints within the Navigation Boulevard corridor.
Task 5 - Recommendations and Implementation Strategy
Identify quick wins (0-2 years), including a potential pilot opportunity, short-term (0-5 years), medium-term (6-10 years), and long-term (11+ years) mobility recommendations to address the needs and issues identified in Tasks 3 and 4. Develop an implementation plan for each of the corridor plan's recommendations.
Task 6 - Final Report
Provide all final deliverables in professional, publication-ready and editable formats. Deliverables must incorporate H-GAC comments and include all supporting data, analyses, GIS files, maps, graphics, photographs, and other project materials developed during the study.
**RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:** https://procurement.opengov.com/portal/h-gac
Submissions must be in PDF or Excel format ONLY where indicated and uploaded to the designated section. Documents uploaded into incorrect sections or other formats may be deemed non-responsive and the submission rejected. Additionally, zip files are not allowed.
All responses and required documents must be submitted via the OpenGov system before the deadline. The system will close automatically at the specified time, and late or incomplete submissions will not be accepted.
Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted.
H-GAC estimates that the resulting contract will have an initial term of approximately twelve (12) months. [...] H-GAC makes no guarantee of volume or usage under any contract resulting from this Solicitation.
Exceptions to these standard terms and conditions are not allowed, and will not be reviewed.
Subscribe to get these 2 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.