On-Call Engineering Services for Establishment of Quiet Zones

Active CIZ26-TPW-4018 RFQuArchitecture & EngineeringCity of Dallas
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Dallas (Texas) posted this RFQu on Nov 12, 2026. Responses are due Dec 4, 2026. Category: Architecture & Engineering. Questions are due 2026-11-25 15:00. Solicitation number CIZ26-TPW-4018.

Solicitation details

General information

Solicitation number
CIZ26-TPW-4018
Notice type
RFQu
Place of performance
Texas
Questions due
2026-11-25 15:00

Agency and category

Agency
City of Dallas
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Dallas Department of Transportation and Public Works (City) is seeking Statements of Qualification (SOQs) from experienced civil engineering firms who can demonstrate they have the resources, experience, and qualifications to provide engineering services for the establishment of Quiet Zones in various locations throughout the City of Dallas.

The purpose of this project is to provide professional engineering services necessary to evaluate, design, coordinate, and support the establishment of one or more railroad quiet zones in accordance with applicable Federal Railroad Administration (FRA) regulations, railroad requirements, state requirements, and local agency standards.

The consultant shall perform all engineering, analysis, coordination, documentation, and support services required to assist the City in obtaining approval and implementation of the proposed quiet zone(s) or re-establishment of existing quiet zones, on an "as needed" basis as determined by the City to include but not limited to the scope of services as described below. The planned term for this contract is for three years.

The approximate engineering services budget for this contract is **$150,000.00**, which is included for informational purposes only and may be adjusted by the city. [...]

Scope

These services may include, but are not limited to:

- Production of signed and sealed engineered Quiet Zone diagnostic report, risk analysis, feasibility analysis, evaluation of existing and proposed safety measures, preliminary engineering design, environmental and regulatory documentation, and potentially the development of full associated plans, specifications and estimates (PS&E).

When the City identifies a specific project, the City will issue a written Request for Proposal(s) to the firm awarded the As-Needed Master Contract under this solicitation. The City will place individual written Service Order assignments with that firm as needed and as required.

The major scope of services covers the following categories:

  • Task 1: Project Management and Coordination. Deliverables: Project management plan. Meeting agendas and meeting minutes. Monthly progress reports. Updated project schedule.
  • Task 2: Existing Conditions Assessment. Deliverables: Existing conditions memorandum. Field assessment documentation. Existing crossing inventory.
  • Task 3: Quiet Zone Feasibility Analysis. Deliverables: Quiet zone feasibility report. Risk analysis documentation. Recommended quiet zone limits.
  • Task 4: Supplementary Safety Measures (SSMs) and Alternative Safety Measures (ASMs). Deliverables: Alternatives evaluation report. Conceptual improvement layouts. Preliminary cost estimates.
  • Task 5: Preliminary Engineering and Design, as applicable. Deliverables: Preliminary engineering plans. Preliminary quantity estimates. Engineer's opinion of probable construction cost.
  • Task 6: Environmental and Regulatory Documentation, as applicable. Deliverables: Environmental review memorandum. Permit coordination documentation.
  • Task 7: Quiet Zone Implementation Documentation. Deliverables: Draft and final Notice of Intent. Draft and final Notice of Establishment. Supporting calculations and exhibits.
  • Task 8: Final Design and Construction Support (Optional). Deliverables: Final PS&E package. Construction support documentation. Final inspection reports.

Final Project Deliverables

At a minimum, the consultant shall provide:

  • Project Management Plan.
  • Existing Conditions Assessment Report.
  • Quiet Zone Feasibility Study.
  • Risk Index Calculations.
  • Alternatives Analysis Report.
  • Conceptual and Preliminary Engineering Plans.
  • Cost Estimates.
  • Environmental and Regulatory Documentation.
  • Notice of Intent Package.
  • Notice of Establishment Package.
  • Final Project Report

Additional information

All submittals to be uploaded into the Euna (https://dallascityhall.bonfirehub.com/login) system by **1:00 p.m. on Friday, December 4, 2026**. The prime respondent must submit the SOQ in a **PDF format** in Euna. Late submittals will not be accepted. Hard copy submittals are not permissible.

The submittal must consist of and is limited to the following attachments in numerical order: Cover Page, Topic Question Responses, and Appendix - Organizational Chart.

Evaluation

  • Topic 1: 30%
  • Topic 2: 25%
  • Topic 3: 10%
  • Topic 4: 10%
  • Topic 5: 5%
  • Topic 6, Developing Regional & Inclusive Vendor Enterprises (DRIVE) Plan (SBE Goal 15.19%): 20%

The SOQ document is limited to a total of eleven (11) 8-1/2"X11" pages, exclusive of the cover page, references, resumes, the organizational chart, and required forms.

Minimum qualifications (required)

  • Project Manager: is a licensed professional engineer in the State of Texas, has a minimum of seven years of experience in schematic development or roadway design inclusive of a minimum of three years in work associated with the establishment of railroad quiet zones, and a minimum of five years as a responsible project manager.
  • Task Leader: is a licensed professional engineer in the State of Texas for the assigned respective work category except for surveying where a registered land surveyor is required, and has a minimum of five years of demonstrated experience.

At the city's discretion, interviews may be conducted. The planned term for this contract is for three years.

Documents

5 files

Subscribe to get these 5 documents.

  • CIZ26-TPW-4018 - On-Call Quiet Zones - RFQ.pdf
    Download
  • Exhibit A - Required Documents.pdf
    Download
  • Exhibit B - Documents Required Upon Request.pdf
    Download
  • RFQ Engineering Ad 2026 CIZ26-TPW-4018 - Quiet Zones.docx
    Download
  • SBE List- On-Call Engineering Services for Establishment of Quiet Zones- CIZ26-TPW-4018 20261106124400 4035.xlsx
    Download

Similar open bids

In Texas

More from City of Dallas

Open bids