City of Dallas (Texas) posted this RFQu on Nov 12, 2026. Responses are due Dec 18, 2026. Category: Architecture & Engineering. Solicitation number CIZ-DWU-27 001E.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Dallas Water Utilities invites qualified engineering firms to submit Statements of Qualifications (SOQs) for conducting a Facility Siting Study. The purpose of the study is to evaluate potential locations for one or more monofil sites for disposal of drinking Water Treatment Plant (WTP) residuals. The consultant shall have the ability to further assist with property acquisition, preliminary design, and permitting assistance for one monofil site as determined by owner based on funding availability and priority. A qualified team is expected to have experience with water treatment plant residuals facilities including relevant solid waste and monofil site selection, permitting and design.
Conduct a siting study to identify a monofil site(s) to serve all three WTPs. Multiple sites may be a part of the recommended solution for economic reasons or if a single site does not meet the capacity needs or have transport limitations. Assist in acquiring the property by providing survey support, appraisal and other due diligence. Following acquisition, the consultant shall develop preliminary design documents of sufficient detail to facilitate permitting, and the consultant shall assist the owner in obtaining necessary permits.
Specific Requirements
Deliverables and Schedule
This project is expected to be completed within 24 months of notice to proceed. The deliverables are as needed to deliver the project as described in the description of basic services in addition to the final report of the project.
This project is expected to be completed within 24 months of notice to proceed.
The solicitation lists *Requirements for Organization of the Statement of Qualifications* and *Consultant Selection Guidelines and Requirements* as attached documents.