City of Waco (Texas) posted this IFB on Nov 18, 2026. Responses are due Dec 17, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-10 17:00. Solicitation number RFB2026-060.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Waco project is located along New Road between Franklin Avenue and Tulane Street/ Hiland Drive, this project generally consists of rehabilitating components of the existing New Road Bridge, including the bridge superstructure and substructure, roadway approaches, sidewalks, and all necessary components as shown on the project drawings and as specified herein.
Engineering Estimate: **$4.3M**
Basic Scope of Services
Duration of Service
The City of Waco is seeking to have the work that is the subject of this RFB to be completed within **314 Calendar days** - Substantial Completion and **344 Calendar Days** - Final Completion, from the date of the Notice to Proceed.
Submission
Contractors should submit their bids through the City of Waco's eProcurement portal at waco-texas.bonfirehub.com/login. Paper/Physical submissions will still be accepted and should include one (1) electronic copy (CD or Flash Drive) and (1) original and two (2) copies. The City will NOT accept a response submitted by facsimile transmission (fax) or by electronic mail (email).
Responses to this solicitation must be received by **2:00 p.m. (Central Time) on December 17, 2026**. All submissions shall be sent to the attention of the Purchasing Agent in a sealed envelope that is clearly marked on the outside as follows: "RFB 2026-060 New Road Bridge Rehabilitation"
Bid Security
Each submission must be accompanied by a certified check of the submitter, or a bid bond (PDF copy through the eProcurement portal) executed by the submitter as principal and having as surety thereon a surety company approved by the City in the amount of **5%** of the submission. The Surety's Power of Attorney must accompany the bid bond.
Award
For this solicitation, the City will award the contract to the Lowest Responsible Bidder. The contract will be awarded to the lowest responsible bidder based on the base bid plus any selected alternatives provided the amount does not exceed the funds then estimated by the City as available to finance the contract.
A submission responding to this RFB signifies the vendor's agreement that the submission, and the content thereof, are valid for ninety (90) days following the submission deadline unless otherwise agreed to in writing by all parties.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.