Tabor to 138kV Interconnection Project

Active 001-02-27 IFBUtilities & EnergyBryan Texas Utilities
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Bryan Texas Utilities (Texas) posted this IFB on Nov 18, 2026. Responses are due Jan 12, 2027. Category: Utilities & Energy. Questions are due 2026-12-30 14:00. Solicitation number 001-02-27.

Solicitation details

General information

Solicitation number
001-02-27
Notice type
IFB
Place of performance
Texas
Questions due
2026-12-30 14:00

Agency and category

Agency
Bryan Texas Utilities
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Proposals are requested by Bryan Texas Utilities, a municipally owned electric system of the City of Bryan, Texas, hereinafter referred to as the “Owner”, for construction work for the TABOR TO 138KV INTERCONNECTION PROJECT.

In order for their proposals to be considered, bidders must demonstrate that they are qualified to satisfactorily perform the specified work.

Scope

Each concrete, steel and wood pole unit consists of one (1) concrete, steel or wood pole structure erected in place. It does not include pole top assembly units, conductor, shield wire or grounding units. [...] Construction bids shall consider that the steel, concrete and wood poles will be delivered to a staging area near the project. Contractor shall be responsible for cost incurred to move the poles to their final staked location.

A pole top assembly unit consists of the hardware required to support the 138 kV conductor, shield wire and fiber optic cable. It does not include the conductor and shield wire stringing or grounding units.

A Foundation Unit consists of one (1) foundation in place using either wet-hole or dry-hole construction methods. Anchor Bolts and templates will be provided by the Owner for the drilled piers. [...] Installation of pole and foundation grounds (Grounding Material will be provided by the Owner), all as more fully described in the Drawings and Specifications, are to be included in the unit price.

A wire installation unit shall consist of installing or transferring one thousand (1000 ft., measured by horizontal stationing) of a single conductor or shield wire and includes stringing and sagging all wires and splicing all wires. It does not include grounding units.

A wire removal unit shall consist of removal one thousand (1,000 ft.) of a single conductor or shield wire and includes unclipping, placing the conductor in blocks, necessary guard structures, removal of the conductor under tension, coiling and returning the materials to the Owner's warehouse.

The work above shall be performed during ERCOT approved line clearances. It is possible the approved clearances will fall during off-peak (nighttime) periods. Therefore, Bidders are to provide a nighttime work multiplier to be applied to the unit costs above in the event nighttime work is required.

Additional information

Submission

You may upload one (1) electronic bid response to the City’s procurement website at https://brazosbid.ionwave.net/. The electronic submission must include all required elements of the bid, such as pricing, required forms, and supporting documentation.

Alternatively, if you choose to submit a hard copy, one (1) original bid response must be returned in a sealed envelope clearly bearing the name and address of the respondent. Any Bid received on or after 2:00 PM CST will not be accepted.

Evaluation

Bids will be evaluated by the Purchaser, based on quality, time required for completion and experience of the contractor. The Purchaser reserves the right to select the bid which best suits its needs whether the price is the lowest or not, and also reserves the right to reject any or all bids and to waive irregularities therein.

Bonds and guarantee

Each proposal shall be accompanied by a proposal guarantee (bid bond or cashier’s check) in an amount not less than **five percent (5%)** of the total proposal price.

Other requirements

Each bidder shall attend a **Mandatory** Pre-Bid meeting. Each bidder shall visit the site of the work.

Each proposal shall contain a contingency of **20%** of the total base bid amount for “extra work”.

Liquidated damages of **five thousand dollars ($5,000)** shall be charged against the account of the selected contractor for each day that completion of the TABOR 138KV INTERCONNECTION PROJECT is delayed.

Documents

3 files

Subscribe to get these 3 documents.

  • ATTACHMENT B - Bid Units.xlsx
    Download
  • RFB 001-02-27 Tabor to138kV Interconnection_11.17.26.pdf
    Download
  • ATTACHMENT A - Drawings-Design Package.pdf
    Download

Similar open bids

In Texas