Request for Information - TRAX Light Rail Signaling and Train Control Modernization Industry Outreach

Active 26-04075 RFITransportation & FleetUtah Transit Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Transit Authority (Utah) posted this RFI on Nov 12, 2026. Responses are due Dec 23, 2026. Category: Transportation & Fleet. Questions are due 2026-11-25 17:00. Solicitation number 26-04075.

Solicitation details

General information

Solicitation number
26-04075
Notice type
RFI
Place of performance
Utah
Questions due
2026-11-25 17:00

Agency and category

Agency
Utah Transit Authority
Category
012Transportation & Fleet
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Utah Transit Authority (UTA) is issuing this Request for Information (RFI) to gather information from industry partners regarding emerging technologies, delivery approaches, implementation strategies, and lessons learned related to rail signaling, train control, communications, and associated infrastructure UTA it seeks to modernize its legacy train control system for its TRAX light rail system (TRAX). This RFI is intended to support the UTA’s long-term planning and future procurement strategy for system upgrades, state-of-good-repair investments, safety improvements, and operational improvements across TRAX.

UTA is requesting information from the industry to modernize TRAX train control and detection system, which meets the TRAX Forward goals by addressing dark territory, bi-directional signaling and equipment obsolescence topics.

Scope

With portions of the current system running in dark territory, UTA seeks to prioritize operator, rider and public safety with a focus to improve safety by updating obsolete equipment. Solutions need to be implementable with the current rolling stock, future rolling stock, and should be safe and reliable. UTA may use the information from this RFI to develop a technical specification that meets its four main objectives.

Four goals in modernizing the train control include:

1. Signal Compliance: Ensuring that TRAX light rail vehicles stop before passing a Red Signal or any other Stop Signal to prevent signal violations and associated hazards.
2. Speed Enforcement: Enforcing adherence to authorized speed limits for TRAX vehicles to maintain safe operating conditions and reduce the risk of overspeed incidents.
3. Collison Prevention: Preventing train-to-train collisions on tracks used for passenger services, thereby ensuring the safety of passengers and operators.
4. Work Zone Protection: Preventing violations of roadway work zones to protect maintenance crews and ensure safe operations near active work sites.

Feedback Requested

Responses should focus on the following applications:

  • Modern signaling technologies
  • Safety
  • System cohesion between TRAX and freight operators
  • Automatic Train Operation (ATO)
  • Automatic Train Protection (ATP)
  • Transit Signal Priority (TSP)
  • Wayside and onboard equipment modernization
  • Interlocking modernization
  • Network and communications systems
  • Cybersecurity approaches
  • Project delivery, implementation and costs

Respondents should categorize their responses as follows:

  • Signaling and train control
  • Communications systems
  • Operations and maintenance
  • Onboard equipment
  • Back Office Systems (BOS)
  • Cybersecurity
  • Best practices related to temporally separated freight operations

UTA seeks information on industry best practices for the type of delivery method to modernize existing train control systems.

Additional information

**Submission:** Responses must be uploaded to Euna by the “Bid ends” date and time listed on Euna. All questions must be submitted via the Euna portal. UTA’s answers to timely submitted questions will be posted on the Euna Q&A page.

The UTA seeks detailed yet succinct responses that demonstrate the Respondent’s experience and/or familiarity with the subject matter. As this is not a competitive RFP process, Respondents should not provide any detailed and specific cost or customized pricing documentation in their response. General cost estimates, ballpark estimates, or standard pricing history are permitted.

Responses to this RFI may be developed in a manner that suits the respondent. Number each response to correspond to the relevant question or instruction in the RFI to allow for comparison and clarity.

Vendor must sign Non-Disclosure Agreement (NDA) to review UTA Systems.

UTA will review responses received for the purpose of gathering information and conducting market research only. UTA will not score, or rate responses received. This is a non-binding Request for Information. Therefore, no award shall be made as a result of the RFI process.

All submissions in response to this RFI will be considered public records available for public inspection pursuant to the State of Utah Records Access Management Act.

Documents

2 files

Subscribe to get these 2 documents.

Similar open bids

In Utah