Virgin Islands Police Department (Virgin Islands) posted this RFQ on Nov 25, 2026. Responses are due Dec 4, 2026. Category: Public Safety & Emergency. Solicitation number BD-27-500-5002-3880.
This informal bid solicitation is being conducted pursuant to Title 31 Section 239(a)(3) of the Virgin Islands Code. The Government reserves the right to cancel this informal bid solicitation. **All quotes must be submitted via GVIBuy for consideration.**
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Virgin Islands Police Department (VIPD) seeks the installation of an integrated access control and video surveillance system at the Havensight Executive Staff Office. The project is intended to enhance facility security, regulate access to restricted areas, improve monitoring of entrances and designated exterior locations, and support the protection of personnel.
The project includes the installation and configuration of eight access control card readers, two security cameras, and one main entrance intercom system.
The contractor shall provide, install, configure, and test the access control, CCTV surveillance, and intercom equipment identified below. [...]
1. Executive Staff Office – Exterior Entrance: Install a card reader to control and monitor authorized entry.
2. Hallway Door to Executive Staff Office: Install a card reader to restrict access to the Executive Staff Office from the hallway.
3. AC/DC Office Hallway: Install access control and a card reader to secure access to the designated office area.
4. First Door After the Main Front Entrance: Install a card reader to regulate access beyond the initial entrance.
5. Second Executive Office – Exterior Door: Install a card reader to control authorized access.
6. Third Executive Staff – Exterior Door: Install a card reader to control authorized access.
7. Employee Main Entrance: Install a card reader to manage employee entry and exit as required.
8. Server Room: Install a card reader to restrict access to authorized personnel and protect critical IT infrastructure.
9. Main Entrance Camera: Install a security camera positioned to monitor the entrance and capture relevant activity.
10. RTIC Area Camera: Install an exterior security camera positioned to monitor the designated area and support security operations.
11. Main Entrance Intercom: Supply and install an intercom system to facilitate communication between visitors and authorized personnel before entry is permitted.
[...] Access control installation shall include compatible hardware, mounting materials, wiring, power supplies, door locking hardware where required, and system programming. Camera installation shall include appropriate mounting hardware, network connectivity, power requirements, and configuration. The intercom installation shall include the necessary equipment and wiring. [...]
Testing and Acceptance
Upon completion of installation, the contractor shall perform functional testing and demonstrate that:
12. All card readers recognize authorized credentials and restrict unauthorized access.
13. Door locking and release mechanisms operate correctly and comply with applicable life-safety requirements.
14. The main entrance intercom provides clear and reliable communication.
15. Both security cameras provide usable video and are accessible through the designated viewing or recording platform.
[...] Final equipment documentation and a project completion report.
This informal bid solicitation is being conducted pursuant to Title 31 Section 239(a)(3) of the Virgin Islands Code. The Government reserves the right to cancel this informal bid solicitation. **All quotes must be submitted via GVIBuy for consideration.**
The contractor shall conduct a site assessment to verify door conditions, mounting locations, cable pathways, network availability, and power requirements.
The contractor shall coordinate any required network access, system integration, or firewall changes with VIPD IT personnel.
The contractor shall address installation deficiencies identified during testing before project acceptance.