Pierce County (Washington) posted this RFP on Nov 25, 2026. Responses are due Dec 18, 2026. Category: Environmental Services. Questions are due 2026-12-11. Solicitation number OpenGov-bb97b2ad.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Pierce County Surface Water Management (SWM) Division seeks multi-year services from a lake management firm qualified to implement strategies necessary to address noxious plant growth and cyanobacteria in the lake. This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms.
The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management District, which is currently authorized to operate through 2031.
The project is estimated to cost **$1,400,000.00**, not including WA State Sales Tax.
This includes the use of chemical and mechanical methods for controlling excess aquatic vegetation (including, but not limited to, Curlyleaf Pondweed and White/Fragrant Waterlily) and to reduce phosphorus levels to reduce the occurrence of harmful algal blooms. It also includes services related to surveying and mapping the nature and extent of noxious aquatic plant growth, post treatment evaluation, posting of public notices necessary to satisfy applicable regulatory and permit conditions, and pre- and post-treatment monitoring as required by permits.
The contractor will also be expected to produce a written project report at the end of each season, attend at least one (1) public meeting each year, and maintain active communications with Pierce County staff.
Specific treatment strategies may vary over time, depending on budgetary factors and feedback from County Council and the public. SWM will develop an annual workplan that includes select lake management strategies from the *Integrated Aquatic Vegetation Management Plan* (IAVMP) and *Lake Cyanobacteria Management Plan* (LCMP). The Annual Workplan is subject to Council approval.
Contractor must be a Washington State Licensed aquatic herbicide applicator. If the contractor does not perform the work, they are responsible for hiring and direct the licensed applicator to ensure compliance with all conditions of the permits.
Contractor must demonstrate the ability to transmit spatial data in a GIS-compatible format, including but not limited to industry standard file types (e.g., shapefiles, geodatabases, or other interoperable formats) that allow for seamless integration with the County’s GIS environment.
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/piercecountywa
The need for these services is expected to begin in March of 2027 and last the duration of the Lake Management District, which is currently authorized to operate through 2031.
Contractor must be a Washington State Licensed aquatic herbicide applicator.
Subscribe to get these 3 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.