City of Port Orchard (Washington) posted this RFQu on Nov 23, 2026. Responses are due Dec 21, 2026. Category: Architecture & Engineering. Solicitation number PORTORCHARDWA-15C5066D.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Port Orchard solicits Statements of Qualifications (SOQ) from qualified A&E consulting firms with expertise in the preparation of Water System Plan Updates (the “Project”).
The City of Port Orchard is requesting Statements of Qualifications (SOQs) from consulting firms experienced in municipal water planning, system modeling, and utility financial analysis. Port Orchard is a rapidly growing city of just over 20,000 residents, located on the shores of Sinclair Inlet on the Kitsap Peninsula. [...] In 2027, the City will begin construction to combine its two separate water systems into a single integrated system. This RFQ seeks a consultant team capable of delivering a modernized Water System Plan and conducting a comprehensive rate and connection charge study that positions the utility for reliability, equity, regulatory compliance, and financial resilience.
Request for Qualifications (RFQ): Water System Plan Update, System Modeling, System Consolidation Planning, Efficiency & Conservation Analysis, Capital Facilities Planning, and Comprehensive Water Rate & Capital Facility Charge (CFC) Study.
Port Orchard’s water utility currently operates two independent water systems that differ in infrastructure, pressure zones, and operational characteristics. Upcoming consolidation presents a unique opportunity to evaluate capacity, improve operational efficiency, and update financial structures to support future system investments. The Water System Plan will become the guiding document for future capital, financial, and operational decisions.
The City intends to utilize the City’s standard consultant agreement for this work. The Project shall occur in 2027, with the option for the City of Port Orchard to extend the consultant agreement for additional time if necessary at the City’s sole discretion.
Submittal
Please submit your SOQ to: City of Port Orchard, bidsandproposals@portorchardwa.gov RE: Water System Plan Update 2027, no later than **2:00pm 12/21/2026**. Submittals will not be accepted after that time and date.
The consulting firm’s SOQ shall be limited to **10 pages**, including resumes, cover sheet and cover letter. Submittals shall include a completed and signed *Non-Collusion Affidavit* form (Attachment A, which can be added on as page 11).
Evaluation Criteria
1. Project Manager and Key Personnel Qualifications (15 points)
2. Firm and Team Qualifications (20 points)
3. Project Understanding and Approach (20 points)
4. Ability to Meet Schedule and Deliverables (15 points)
5. Regulatory and Local Knowledge (10 points)
6. Relevant Experience and References (10 points)
7. Water System Consolidation and Financial Planning Experience (10 points)
Interviews, if considered necessary, will be held with selected Consultants based on an evaluation of the Qualifications. All submittals will be evaluated using the same criteria and weighting.
New Contract in Place: 1/31/2027 (dates are estimates and subject to change by the City).