RFQ – Construction Manager at Risk (CMAR) Services – Terminal Improvement Program: Terminal Expansion & Renovation

Active YEAGERAIRPORT-E037F1A2 RFQuConstruction - BuildingCentral West Virginia Regional Airport Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Central West Virginia Regional Airport Authority (West Virginia) posted this RFQu on Nov 16, 2026. Responses are due Jan 14, 2027. Category: Construction - Building. Questions are due 2026-12-09 16:00. Solicitation number YEAGERAIRPORT-E037F1A2.

Solicitation details

General information

Solicitation number
YEAGERAIRPORT-E037F1A2
Notice type
RFQu
Place of performance
West Virginia
Questions due
2026-12-09 16:00

Agency and category

Agency
Central West Virginia Regional Airport Authority
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Central West Virginia Regional Airport Authority (“Authority”), owner and operator of West Virginia International Yeager Airport (“CRW” or “Airport”), is soliciting Statements of Qualifications (SOQ) from qualified firms or teams (“Respondents”) to provide Construction Manager at Risk (CMAR) services for the Terminal Improvement Program (“Project”).

This is Step One of a two-step qualifications-based procurement process. Step One consists of this Request for Qualifications (RFQ), through which the Authority will evaluate submitted SOQs and establish a shortlist of the most qualified Respondents. Step Two will consist of a Request for Proposals (RFP) issued only to shortlisted firms, which will solicit fee and rate proposals, technical approach, and other factors necessary for final selection and negotiation of a Preconstruction Services Agreement, to be followed by development and negotiation of a Guaranteed Maximum Price (GMP) for construction.

This RFQ addresses Step One only. Firms responding to this RFQ are not being asked to submit fee, rate, or price information at this stage; do not submit pricing or rate information in response to this RFQ.

Scope

The Project involves modernization of the CRW terminal building, an amalgamation of multiple independent additions dating back to the original 1946 building, with major additions in 1970, 1983, 2000, and 2009. The Project scope, as reflected in the current 30% Engineer's Design Report (April 2026), includes:

  • New terminal building construction adjoining the existing terminal, at the Operations Level and Passenger Level, totaling approximately 44,000 SF;
  • Renovation of the central portion of the existing terminal building;
  • Civil site work including site preparation, geometry, paving, grading, storm drainage, and utility connections outside the building;
  • Structural foundation and building support systems;
  • Mechanical, Electrical, and Plumbing (MEP) systems throughout the new and renovated areas; and
  • Associated environmental controls, including erosion and sediment control and stormwater management; and, general building and facility improvements.

The selected CMAR will provide preconstruction services with the intent of forming a Guaranteed Maximum Price (GMP) to assume risk for delivery of the Project. The CMAR will be responsible for construction means and methods, and will solicit competitive bids from prequalified subcontractors using an Authority-approved subcontractor selection process.

**Preconstruction services** will include, but are not necessarily limited to:

  • Continually reviewing documents to confirm conformance with Project budget and schedule;
  • Developing cost information and analysis, including independent cost estimating at design milestones, to facilitate Authority decision-making;
  • Conducting value analysis to identify opportunities to reduce construction cost and improve constructability or facility performance;
  • Developing a detailed phasing plan and construction schedule, including identification of long-lead items, off-site fabrication, and Authority-supplied equipment/materials;
  • Establishing a Guaranteed Maximum Price (GMP) for the Project, or for identified work package(s), in coordination with the Authority, Program/Project Manager (if engaged), and design team.

**Construction phase services**, to commence upon GMP acceptance and issuance of a construction Notice to Proceed, will include, but are not necessarily limited to:

  • Managing the work, including subcontractor activities, throughout construction of the Project;
  • Developing and administering the project safety program for an active commercial-service airport environment;
  • Managing contract closeout and turnover processes; and
  • Overseeing and coordinating remedial work during the warranty period.

Additional information

**Submission method:** Each Respondent must submit **three (3) hard copies** of the complete SOQ, along with **one (1) electronic copy in PDF format** (via USB drive or a link referenced in the submittal, such as a cloud storage link). SOQs must be enclosed in a sealed envelope, box, or package clearly marked: “Statement of Qualifications — CMAR Services, Terminal Improvement Program.” SOQs submitted after the deadline specified in Section 1.3 will be rejected as late and will not be accepted.

Do not submit fee, rate, or price information with this SOQ. Any pricing information included will not be evaluated and may render the SOQ non-responsive.

The Authority will only accept written questions submitted by email to CMAR@flycrw.com no later than the deadline shown in Section 1.3.

Raw scores of 0 (Unacceptable) to 5 (Outstanding) will be applied within each category and weighted to the maximum points shown:

  • Firm & Team Experience (incl. References): 25
  • Key Personnel: 25
  • Project Approach & Understanding: 20
  • Safety Record: 10
  • Total: 80

The CMAR shall furnish and maintain, throughout performance of the work, a separate performance bond and a separate labor and material payment bond, each in the amount of the total Contract Price (as modified from time to time), conditioned upon faithful performance and payment of all obligations arising in connection with the work. Insurance shall be contractor-provided.

No pre-submittal conference or site visit will be held in connection with this Step One RFQ.

Documents

1 file

Subscribe to get this document.

  • RFQ – CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES.pdf
    Download

Similar open bids

In West Virginia