California Department of Transportation (California) posted this RFQu on Nov 16, 2026. Responses are due Jan 11, 2027. Category: Construction - Heavy & Civil. Questions are due 2026-12-16 15:00. Solicitation number 112T37CM.
112T37CM
The Project is located in San Diego County on Interstate 805 in the Cities of San Diego, Chula Vista, and National City from East Palomar Street to the Junction I-5/I-805 Separation and on I-5 in the Cities of San Diego, Del Mar, Solana Beach, Encinitas, Carlsbad, and Oceanside from the Junction 5/805 Separation to Harbor Drive.
The Project is a set of defined work packages that will modernize existing roadway infrastructure along the I-5 and I-805 corridors to create over 40 miles of continuous Express Lanes. The work packages will construct the necessary pavement striping, signage, traffic safety elements, paving, and electrical items in coordination with SANDAG's TSI contract.
A more detailed description of the Project is contained in Appendix A.
The estimated cost of this CMGC Project (in 2026 US dollars) is **$386,000,000** for construction capital and **$1,000,000** for Right of Way capital (including utility relocation).
2 - Procurement Schedule
4.2 Quantities, Due Date, Time, and Location:
One original and an electronic submittal of the SOQ shall be provided. The original shall be identified on its front cover, in the upper right-hand corner as (Original).
All SOQs shall be received by **3 p.m. Pacific Time** on the day specified in Section 2.- Procurement Schedule, unless modified by Addenda:
Please refer to the RFQ for goal requirement and attachments for licensing requirements for this contract.
Please refer to the RFQ attachments for licensing requirements for this contract.
Unfortunately, the Department does not have a plan holders list of available proposers, nor does it have a way of identifying companies or entities that may have downloaded the project documents for teaming purposes. It is the responsibility of the consultants/subs/vendors to identify teams that may be submitting an Statement of Qualification's.
The Department will allow the use of text with font size smaller than 12-point for only charts, tables, exhibits, and other illustrative and graphical information.
Addendum 1 - Updated Link to A4 Additional Project Combined Documents
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Department hereby requests SOQs from qualified Proposers interested in entering a contract for preconstruction services, with the potential for continuing to a second contract for construction of all or part of the Work, for the I-5/I-805 Express Lanes Corridor (Project).
The Project is located in San Diego County on Interstate 805 in the Cities of San Diego, Chula Vista, and National City from East Palomar Street to the Junction I-5/I-805 Separation and on I-5 in the Cities of San Diego, Del Mar, Solana Beach, Encinitas, Carlsbad, and Oceanside from the Junction 5/805 Separation to Harbor Drive.
The estimated cost of this CMGC Project (in 2026 US dollars) is **$386,000,000** for construction capital and **$1,000,000** for Right of Way capital (including utility relocation).
The Project is a set of defined work packages that will modernize existing roadway infrastructure along the I-5 and I-805 corridors to create over 40 miles of continuous Express Lanes. The work packages will construct the necessary pavement striping, signage, traffic safety elements, paving, and electrical items in coordination with SANDAG's TSI contract. A more detailed description of the Project is contained in Appendix A.
As part of the Project team, the selected Construction Manager may provide input on schedule, phasing, constructability, cost and estimates, value engineering, and plan review throughout the design process. In addition to aiding the design process, the selected Construction Manager will be asked to prepare and submit a proposed price for the labor, equipment, and materials that will be required to construct the Project based on the design process, plans, specifications, and estimate packages after the Office Engineer review of the Project.
The projects will modernize the existing High-Occupancy Vehicle (HOV) lanes to High-Occupancy Toll (HOT) lanes, referred to herein as Express Lanes. This project will also close critical gaps in the managed lane network and extend the system to provide greater continuity and connectivity.
The Department will use a single-phase procurement process to select a CMGC Contractor to deliver the Project. The RFQ is issued to solicit information, in the form of a SOQ and Proposer interviews that the Department will evaluate to determine which Proposers are qualified to successfully deliver the Project in a two-part contract:
1. Part one: A "Preconstruction Services Contract" which includes consulting services to assist with the design of the Project.
2. Part two: A "Construction Contract" to build the Project, if an Agreed Price is reached.
Submission
One original and an electronic submittal of the SOQ shall be provided. The original shall be identified on its front cover, in the upper right-hand corner as (Original). All SOQs shall be received by **3 p.m. Pacific Time** on the day specified in Section 2.- Procurement Schedule, unless modified by Addenda.
Contract Type
The Preconstruction Services Contract will be a reimbursement contract at specific rates not to exceed **$2,500,000**. As shown in Appendix C, Form H, the Preconstruction Services Contract fee is set at four (4) percent and the Preconstruction Services Contract escalation is set at three (3) percent. The Construction Contract will be a unit price contract.
Procurement Schedule
The RFQ documents and Addenda are distributed through the Data Room at the Cal eProcure Web site address: https://caleprocure.ca.gov.
Subscribe to get these 5 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.