Trower Avenue Paving (Linda Vista Avenue to Solano Avenue)

Active OpenGov-529e8ab9 IFBConstruction - Heavy & CivilCity of Napa
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Napa (California) posted this IFB on Nov 16, 2026. Responses are due Dec 10, 2026. Category: Construction - Heavy & Civil. Solicitation number OpenGov-529e8ab9.

Solicitation details

General information

Solicitation number
OpenGov-529e8ab9
Notice type
IFB
Place of performance
California

Agency and category

Agency
City of Napa
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Napa, a California charter city (“City”), will accept sealed bids for its Trower Avenue Paving (Linda Vista Avenue to Solano Avenue) Project (“Project”). [...] For use in connection with the Standard Specifications of the State of California Department of Transportation, latest Edition and the Standard Plans of the State of California Department of Transportation, latest Edition (unless otherwise noted in these Specifications), the City of Napa Standard Specifications and Standard Plans dated January 2022, including any supplemental updates thereto, and the Labor Surcharge and Equipment Rental Rates in effect on the date the work is accomplished.

Scope

Order of Work

Contractor shall follow the sequence of activities as set forth herein.

  • Permits, Fees, and City Business License. Contractor shall obtain and paid for all necessary permits required for the Work.
  • Notice of Excavation. Contractor shall comply with all applicable requirements in Government Code §§ 4216 et seq., which are incorporated by reference herein.
  • Project Notification. Contractor shall notify residents and/or property owners and/or business at least 48 hours in advance of the upcoming Work.
  • Traffic and Pedestrian Control Plan. Contractor shall implement approved traffic control plan in accordance with the requirements in the section titled “Traffic Control” of the Specifications.
  • Potholing. Contractor shall pothole five days prior to beginning any excavation all buried utilities and other man-made objects at new concrete and street slope modification locations, check for conflicts, and provide the pothole data and written notice of any suspected conflicts between existing and proposed facilities prior to beginning any excavation.
  • Remaining Work. Contractor shall perform remaining Work in accordance with the Project Plans and these Specifications.

Traffic Control

Contractor shall provide for the safe and orderly movement of traffic at all times during construction. On all streets, one lane in each direction shall be maintained at all times. [...] Contractor shall furnish, maintain, and install two changeable message signs for use on the project at a minimum. [...] No work will commence prior to the submittal and approval of a satisfactory traffic control plan.

Work Items

  • Cold Plane
  • Paving Fabric
  • Hot Mix Asphalt (HMA)
  • Hot Mix Asphalt (HMA) Plug
  • Aggregate Base
  • Miscellaneous Concrete Construction
  • PCC Curb Ramp
  • Pavement Markers
  • Street Signs
  • Thermoplastic Traffic Stripes and Pavement Markings
  • Green Pavement Markings
  • Tree Removal

Additional information

The City will accept sealed bids via **electronic submission** through the procurement portal at https://procurement.opengov.com/portal/cityofnapa, in the manner set forth in the Instructions to Bidders.

Any lane closures shall be limited to the hours of 9:00 AM to 3:00 PM unless authorized by the Engineer. No lane closures will be allowed overnight. No vehicular detours will be allowed.

Documents

9 files

Subscribe to get these 9 documents.

  • Bidders_Questionnaire.pdf
    Download
  • Trower_Avenue_Paving_(Linda_Vista_Avenue_to_Solano_Avenue).pdf
    Download
  • Payment_Bond_(For_Information_Only).pdf
    Download
  • A_-_Trower_Ave_Paving_Special_Conditions.pdf
    Download
  • Performance_Bond_(For_Information_Only).pdf
    Download
  • Trower_Ave_Paving_-_Bid_Set_Plans.pdf
    Download
  • Contract_(For_Information_Only).pdf
    Download
  • Warranty_Bond_(For_Information_Only).pdf
    Download
  • Trower_Ave_Paving_Technical_Specifications.pdf
    Download

Similar open bids

In California

More from City of Napa

Open bids