Construction Management and Inspection Services for Hazel Avenue Interchange Project, Segment 1

Active 81820 RFPConstruction - Heavy & CivilCounty of Sacramento
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

County of Sacramento (California) posted this RFP on Nov 18, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Solicitation number 81820.

Solicitation details

General information

Solicitation number
81820
Notice type
RFP
Place of performance
California

Agency and category

Agency
County of Sacramento
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Construction Management and Inspection Division (CMID) of the Community Development Department of Sacramento County (County), is soliciting proposals for construction support services on the Hazel Avenue at US 50 Interchange Improvement Project – Segment 1 (Project) (see Attachment 1) consisting of construction management, inspection, and quality assurance services to augment and supplement County staff performing similar functions.

The Project includes widening the Hazel Avenue overcrossing of US Highway 50, modifying the westbound on and off ramps to incorporate a shared-use path to improve multimodal connectivity, constructing a retaining wall at the eastbound loop on ramp to increase shoulder width and improve the clear recovery zone, and widening US Highway 50 between Alder Pond and Folsom Boulevard to add an eastbound auxiliary lane.

Scope

The selected consultant will be responsible for the following:

Construction management and inspection services with a team that has experience with Caltrans projects of over $10 million as well as bridge construction methods, materials, and sequencing. The team will be required to cover night work and source inspection (guardrail, street light poles, and overhead signs) as required.

Under these services, the consultant shall provide skilled technical and professional personnel to provide construction administration and inspection. [...]

Consultant will need to provide Quality Assurance (QA) services to ensure materials used in construction meet all relevant specifications and standards. QA tasks may include, but are not limited to inspection, source inspection, sampling and testing concrete, soils, asphalt, pipes, reinforcing steel, welds, connections, etc. This task includes preparation of reports and collection of documentation such as certificates of compliance, mill certifications, aggregate and concrete tags, etc., as delineated in the project specifications and special provisions. Particular attention should be given to FHWA sampling and testing requirements.

This consultant contract will be with CMID and consultant staff will work under the direction of CMID supervisors or managers utilizing CMID procedures. [...]

General

  • Construction Management Plan: Consultant shall prepare a construction management plan including at a minimum an organization chart of the overall Construction Management (CM) project team, a description of the duties and responsibilities of the construction management staff, claims avoidance strategy, anticipated level of effort and a description of the process for submitting, reviewing, and returning submittals, requests for information, and change orders.
  • Mobilize / Field Office Setup: Consultant shall be responsible for mobilizing all necessary staff to and from the project site. [...]
  • Safety Equipment: Consultant shall be responsible for providing all necessary personnel protection equipment to its employees such as hard hats, boots, gas monitors, etc.
  • Weekly Progress Meetings: Appropriate consultant staff shall attend weekly progress meetings between the Contractor, Owner staff, and the CM team throughout the construction project.

Typical Construction Inspection Activities

  • Inspection Plan: Consultant shall prepare an inspection plan containing an outline of all the inspections that need to be made, a checklist of items to include, and the type of tests that are required (including frequency).
  • Inspection: This task will include full or part-time inspection of construction activities and includes construction staking, monitoring all construction work, preparing daily inspection reports utilizing CMID’s database and recording field events [...].
  • Specialty Inspection: This project will require specialty inspection for structures, confined space, as well as source inspection for guardrail, street light poles, and overhead signs.

Document Control

Consultant shall utilize CMID’s document management and tracking system (CMIS) for recording, storage, distribution, tracking, reporting, and retrieval of project information.

Typical Construction Contract Administration

  • Process Contractor Submittals
  • Process Requests for Information (RFI’s)
  • Field Instruction (FI’s)
  • Schedule Review
  • Progress Payments
  • Conflict Resolution / Contract Change Orders (CCO)
  • Project Close-Out

Additional information

Submission

Proposals must be received by the submission deadline in OpenGov Procurement via the solicitation link at: https://procurement.opengov.com/portal/saccounty/projects/309087

Questions concerning this RFP must be submitted to this solicitation’s “Question & Answer” page in OpenGov Procurement prior to the deadline stated on the OpenGov Procurement project page. Questions received via phone or e-mail to direct points of contact for this RFP will not be considered nor responded to.

When submitting a proposal, the proposer must follow the format and contents detailed in *Attachment 2*.

Evaluation

Proposal Evaluation Criteria will be based on the following: (Maximum of 100%)

  • Firm capabilities and specializations (20%)
  • Qualifications and construction experience of proposed personnel (30%)
  • Prior experience in providing construction management and inspection services for transportation projects, including recent experience on similar projects, especially those projects within Sacramento County or for Caltrans (25%)
  • References (10%)
  • The experience of the proposed personnel working with public agencies (15%)

Following the initial review of proposals, consultants will be shortlisted and oral interviews will be held with shortlisted firms. After interviews of the shortlisted firms, a contract will be negotiated with the most qualified firm solely based on the interview evaluation and submitted to the Board of Supervisors for approval.

No consulting firm or sub consulting firm currently working on the design of the Project, regardless whether the firm has a separate construction management group, is eligible to provide personnel on the Project, either as a lead firm or as a subconsultant.

Contract

The selected proposer shall execute an agreement with the County of Sacramento, using the standard consulting agreement (*Attachment 3*). The construction contract duration is 360 working days, with a Notice to Proceed anticipated in January-February 2027. Close-out activities could last several months after field acceptance.

Documents

4 files

Subscribe to get these 4 documents.

  • Att_3_Standard_Consulting_Contract_Agreement.pdf
    Download
  • Att_4_Proprietary_Agreement.pdf
    Download
  • Sample_Fee_Proposal.pdf
    Download
  • Att_1_and_2_Hazel-50_RFP.pdf
    Download

Similar open bids

In California

More from County of Sacramento

Open bids