California Department of Corrections and Rehabilitation (California) posted this RFQu on Nov 12, 2026. Responses are due Feb 1, 2027. Category: Construction - Building. Questions are due 2027-01-07 15:00. Solicitation number 0000040932.
The California Department of Corrections and Rehabilitation is requesting a statement of qualifications from interested design-build entities to provide professional architectural/engineering and construction services for the design and construction of the replacement fire alarm system at the Substance Abuse Treatment Facility located at 900 Quebec Avenue, Corcoran, CA, 93212
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
For this project, CDCR is utilizing a best value, stipulated sum, design-build procurement method under the Public Contract Code Division 2, Part 2, Chapter 1, commencing with Section 10187 under Article 6, whereby CDCR will establish a stipulated sum for the design-build agreement, currently estimated to be between **$38 million and $42 million**. The actual stipulated sum will be defined in the RFP. CDCR will issue the RFP to no more than the three highest scoring DBEs who shall then present their project proposal which shall meet or exceed all programmatic, elemental, functional, and performance-based criteria requirements set forth in the RFP.
SATF is located at 900 Quebec Avenue, Corcoran, CA. 93212. The Institution originally opened in 1997 and consists of seven facilities and comprises a variety of housing unit types and various support buildings.
This scope of services includes demolition of the existing fire alarm system and complete replacement with new fire alarm equipment (including but not limited to detection devices, horns, strobes, control unit annunciator panels, connection to emergency power supplies, and terminal cabinets) within all buildings as required by code. In addition, this scope of services also includes installation of network connections, new fiber pathways, conduits, and cabling as required within all buildings to provide signal monitoring at the central control, complex control, and onsite fire house. All initiating, monitoring, controlling, and notification appliances shall be replaced. These include interconnection to fire protection and life safety systems as required to make the fire alarm system code compliant and functional. [...] All systems requiring interconnection to the fire alarm (including but not limited to fire-smoke dampers, fire shutters, fire suppression system tamper and flow switches) shall be evaluated for repair or replacement in all areas of work. In addition, smoke control/evacuation operation, rated penetrations and head of wall conditions, in areas of work, need to be evaluated for repair and/or replace as well.
The objective of this project is to provide code compliant fire alarm systems throughout the institution and its support buildings, which are fully functioning and maintainable at the completion of the work. The DBE will be required to understand the limits of work as identified in the engineering analysis, meet the requirements of the criteria documents, specifications, and the fire alarm narratives that follow in the RFP.
The means and methods of replacing the existing fire alarm system and providing a new fire alarm system, FACUs and devices are not prescribed. The manufacturer of the FACUs are also not prescribed. The DBE shall evaluate existing conditions and provide a design for a fire alarm system that meet the requirements of the building, electrical and fire protection codes, CDCR 2026 design criteria guidelines and can be inspected and accepted by the Office of the State Fire Marshal (OSFM).
Submission
The completed SOQ package shall include one original paper version marked "ORIGINAL" in the upper right-hand corner of the front cover; four additional hard copies securely bound, each marked "COPY" in the upper right-hand corner of the cover; and one PDF file (in color on a CD-ROM and also on a flash drive) by mail, courier, or hand delivered. Submittals received after the specified time and date will not be considered and will be returned to sender. THIS SUBMISSION DEADLINE WILL BE STRICTLY ENFORCED.
Scoring
DBEs not completing and passing Part A – Questionnaire shall not be evaluated under Part B – Experience. A total of **1,600 points** will apply to Part B - Experience. No more than the three highest scoring DBEs from the RFQ process will be invited to participate in the RFP phase and submit project proposals.
Requirements
Stipend and term
CDCR will pay each DBE that is not awarded the design-build agreement **$30,000** for their project proposal. Project delivery and completion is anticipated within 36 months of the design-build agreement's notice to proceed.