Green Stormwater Infrastructure and Drainage Improvements Project

Active OpenGov-7059ea6d RFPArchitecture & EngineeringTown of Los Gatos
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Town of Los Gatos (California) posted this RFP on Nov 23, 2026. Responses are due Dec 22, 2026. Category: Architecture & Engineering. Solicitation number OpenGov-7059ea6d.

Solicitation details

General information

Solicitation number
OpenGov-7059ea6d
Notice type
RFP
Place of performance
California

Agency and category

Agency
Town of Los Gatos
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Town of Los Gatos is seeking proposals from qualified civil engineering consultants to evaluate and design drainage improvements and green stormwater infrastructure (GSI) at the Town’s Parks and Public Works (PPW) facility and adjacent areas. The project will evaluate opportunities to capture and treat stormwater runoff from building roofs, paved parking and Corp Yard areas, the adjacent ball field and parking lot, and nearby streets where appropriate. The project will also investigate existing drainage deficiencies and flooding concerns affecting the ball field and adjacent parking area.

Scope

The selected consultant will perform a topographic survey, assess existing drainage conditions, evaluate and size potential GSI facilities, develop and compare alternatives, and prepare a preferred concept, preliminary design plans, and construction cost estimates.

Additional information

The tentative schedule is to complete preliminary design and rough order of magnitude cost estimate by April 2027, complete final design for the GSI improvements by December 2027, and begin construction in March 2028. Drainage improvements may be designed and built under a separate timeline depending on the complexity. The Town may adjust the schedule based on project needs, permitting, funding, and site conditions.

Similar open bids

In California

More from Town of Los Gatos

Open bids