Los Angeles World Airports (California) posted this IFB on Nov 19, 2026. Responses are due Dec 9, 2026. Category: Construction - Building. Solicitation number 0521-2026-09-RFB-231762 - Rebid.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Project consists of acoustical treatment modifications at residences identified in the Contract Documents in close proximity to the Los Angeles International Airport, Los Angeles, California. The scope of work includes the installation of replacement acoustically rated windows, sliding glass doors and exterior doors.
The scope of work includes the installation of replacement acoustically rated windows, sliding glass doors and exterior doors. Additionally, the scope of work includes the replacement of doors separating the garage from the livable area of the dwelling and the installation of new ventilation systems, the modification of existing ventilation/air conditioning systems, and/or the installation of new ventilation/air conditioning systems. Miscellaneous items of work may include the fabrication and installation of baffles at through wall air conditioning units, exterior wall patching, the addition of attic insulation, and attic ventilation improvements.
The overall project scope of work includes replacement of windows, sliding glass doors and exterior doors with acoustically rated units and installation of attic insulation, attic vents and other sound reducing measures in single-family and multi-family residences. In addition, the scope includes the installation of new HVAC components (e.g., fan coil units, heat/energy recovery ventilators, and/or ductwork).
The Contractor shall do the work quickly and completely with as little disturbance to the property owners and tenants as possible. The Contractor shall proceed with the work at each project home from beginning to end without interruption.
Execution of the work may involve disturbance of building materials determined to contain asbestos and painted surfaces that may contain lead. [...] All painted surfaces are assumed to contain lead and shall be treated as such when disturbance or removal is required.
**Administrative Requirements Packet:** This Packet must include original, signed documents, and be submitted with your bid/proposal. The Packet should be bound separately from other parts of your bid/proposal and clearly labeled "Administrative Requirements Packet".
The required forms are:
**Bid Bond:** Every bid/proposal must be accompanied by either (a) a check certified by a responsible bank in the City of Los Angeles; (b) a cashier's check issued by a responsible bank; (c) a corporate surety bond of a responsible surety company for an amount not less than **ten percent (10%)** of the amount bid. Failure to include a Bid/Proposal Bond with the bid/proposal will render the bid/proposal non-responsive and will result in its rejection.
Failure to include an Affidavit with the bid/proposal will render the bid/proposal non-responsive and will result in its rejection.
The Contractor shall visit all work sites during the bidding period to verify the exterior physical conditions and surrounds of the proposed work.
Within 15 calendar days of bid opening, the apparent low bidder will submit a formal Type 3 waiver request and the required documentation under 49 USC § 50101 (b).
Contractor shall provide a minimum of one dedicated superintendent for Work covered under this contract.
Should any problem develop within two (2) years from the date of final completion due to faulty or inferior material and/or workmanship, the problem shall be corrected by the Contractor without any expense to the property owner, tenant, or LAWA.
Subscribe to get these 20 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.