RFQ - AIR CONDITIONING UNIT REPLACEMENT AT EMERY REGIONAL COMMUNICATIONS SYSTEM (RCS) RADIO SITE

Active BPM013514 RFQConstruction - BuildingCounty of San Diego
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

County of San Diego (California) posted this RFQ on Nov 25, 2026. Responses are due Dec 15, 2026. Category: Construction - Building. Questions are due 2026-12-09 17:00. Solicitation number BPM013514.

Solicitation details

General information

Solicitation number
BPM013514
Notice type
RFQ
Place of performance
California
Questions due
2026-12-09 17:00

Agency and category

Agency
County of San Diego
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

THE COUNTY OF SAN DIEGO IS SEEKING QUOTES FROM QUALIFIED FIRMS (OFFERORS) TO PROVIDE AIR CONDITIONING UNIT REPLACEMENT AT THE EMERY REGIONAL COMMUNICATIONS SYSTEM (RCS) RADIO SITE IN ACCORDANCE WITH THE TERMS & CONDITIONS CONTAINED WITHIN. THE COUNTY ANTICIPATES AWARDING A ONE-TIME CONTRACT.

Contractor shall replace one (1) wall-mounted air conditioning (A/C) unit with low ambient control, one (1) ICM492 control, and one (1) RSH50 surge protective device located at the regional communication system (RCS) radio site known as EMERY.

Scope

Scope of Work

Contractor shall supply and install one (1) Bard 2-ton model W24A2-A0ZXP4XXJ, “or equivalent,” with one (1) ICM492 control “or equivalent” and one (1) RSH50 surge protective device “or equivalent.” [...] The EMERY Regional Communications Systems (RCS) radio site is located at: 825 Plaskon Lane, Potrero, CA 91963.

Delivery and installation shall be completed within thirty (30) calendar days of the Effective Date of this Agreement. [...] The contractor shall provide the full manufacturer’s warranty on the A/C unit supplied and shall warrant all installation and labor for one (1) year from the date of completion.

Contractor shall possess a current and active C-20 Warm-Air Heating, Ventilation and Air Conditioning Contractor's Classification License with the CA Contractor's State Licensing Board (CSLB). [...] Contractor shall provide all labor, supervision, transportation, materials, connectors, cabling, supplies, tools, equipment, cleanup, and all other necessary items required to complete the A/C unit replacement described herein, including the following:

  • Contractor shall remove and properly dispose of one (1) existing Bard unit (Serial Number 314F153235937-02).
  • Within five (5) business days of removal, Contractor shall provide the Contracting Officer’s Representative (COR) with a letter stating that the unit was properly disposed of.

Contractor shall perform all ancillary work necessary to complete the A/C unit replacement, including:

  • Drill and install new mounting hardware
  • Install new electrical whips
  • Install new control wires
  • Manufacture and install all metal transition pieces for the supply and return grill
  • Apply all sealant, hardware and supports
  • Make all electrical and wiring connections
  • Test new units for proper operation
  • Safety shall be observed at all times

Installation shall occur Tuesday through Thursday, 7:00 AM to 4:00 PM San Diego time, excluding County of San Diego observed holidays. [...] Installation shall be pre-scheduled with the COR at least five (5) business days before installation.

County representative shall conduct final inspection for acceptance.

Additional information

Your response is due through electronic upload to **BuyNet** on the specified close date and time, local San Diego time. If Offeror is unable to submit via BuyNet for any reason, Offeror may submit by email or mail to the listed Contracting Officer, or by personal delivery to the Purchasing and Contracting front desk.

SUBMITTALS WILL BE EVALUATED BASED UPON PRICE. [...] Lowest price may not always be the sole criteria for award of an RFQ.

Quotations are subject to acceptance at any time within 90 days after submission due date/time, unless otherwise stipulated by the County.

A payment bond is **required** for any job totaling over **$25,000**.

Submit a copy of Contractor’s Certificate of Insurance, reference *Exhibit B – Insurance Requirements* for details:

  • Minimum insurance coverage listed on Exhibit B – Insurance Requirement
  • Workers’ Compensation coverage
  • County of San Diego listed as Additional Insured

This Agreement shall begin on the date of the last signature below and end upon completion and County acceptance of Contractor’s performance under this Agreement.

Offerors must attend the job walk to be eligible for award.

Documents

1 file

Subscribe to get this document.

Similar open bids

In California

More from County of San Diego

Open bids