Sutter County Sheriff's Office Medium Jail HVAC Replacement - Design Services

Active SCSO Medium Jail 26-27 RFPArchitecture & EngineeringSutter County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Sutter County (California) posted this RFP on Nov 25, 2026. Responses are due Jan 6, 2027. Category: Architecture & Engineering. Solicitation number SCSO Medium Jail 26-27.

Solicitation details

General information

Solicitation number
SCSO Medium Jail 26-27
Notice type
RFP
Place of performance
California

Agency and category

Agency
Sutter County
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Sutter County Development Services Department is seeking proposals from qualified architectural and engineering consultants or consultant teams to provide design services to prepare construction documents for the replacement of the building's HVAC units and the required upgrades to the building's architectural, structural, mechanical, electrical, and plumbing systems at the Sutter County Sheriff's Office Medium Jail, 1077 Civic Center Boulevard, Yuba City CA, 95993.

[...]

The project did not affect the Medium Jail, so the County is now seeking to make improvements to the facility, which is 16,775 SF, and was constructed in 1993.

Scope

Scope of Work for Consultant

The responsibilities of the Consultant / team include all required professional services needed to evaluate the current architectural, structural, mechanical, electrical, and plumbing systems at the Sutter County Sheriff's Office Medium Jail and prepare construction documents to replace the HVAC units along with necessary upgrades to the building systems to meet the operational demands of the facility. The design shall consider expected energy usage and expected annual operational maintenance. [...]

The project will require a County issued building permit, as well as review and approval of the building modifications by California Board of State and Community Corrections (BSCC) and the State Fire Marshal (SFM).

A partial list of expected responsibilities is as follows:

1. Review the existing building as-built documents, tour the existing facility and meet with the Sheriff’s Office staff to identify the specific needs to be addressed through the project.
2. Develop construction documents, which meet all applicable state and local requirements.
3. Provide opportunities for the County to review and comment on the development of the documents.
4. Provide a construction cost estimate for the project.

Since the project seeks to address replacement of the building's HVAC system, the consultants must consider the construction activities and the year-round operation of the facility, as project phasing may be required. The Medium Jail is composed of two male dorms with a daily capacity of 60 persons and a female dorm with a daily capacity of 40 persons. [...] The Sheriff's Office will provide one dorm, where construction can occur, while the other dorms remain in operation. The Sheriff's Office seeks to improve the ambient temperature and relative humidity within the dorms during the summer months, so the consultant's approach may incorporate the use of temporary cooling and ventilation systems during the project.

Additional information

Please submit **one (1) electronic copy** of your proposal and it's optional to submit three (3) bound hard copies to our office no later than: **3:00 p.m. on Wednesday, January 6, 2027**, Attn: Guadalupe Rivera, P.E., Assistant Director, grivera@sutter.gov.

The consultant’s submittal is limited to a maximum of 20 pages [...]. A cost proposal will not be submitted at this time.

Each criterion will be scored on a scale of 1 – 5 and multiplied by the Weight [...] with the maximum possible score of 190.

1. Project approach and understanding (Weight = 10)
2. Demonstrated competence in completing past projects of similar scope [...] (Weight = 8)
3. History of the firm / team [...] (Weight = 6)
4. Qualifications and workload of team members [...] (Weight = 8)
5. Provide client references [...] (Weight = 6)

The contracting architect or engineer may be required to indemnify and hold harmless the County of Sutter against any and all liability, whether or not caused by the activity of the contracting architect or engineer.

Insurance in the sample agreement:

  • Commercial General Liability: **$2,000,000** per occurrence
  • Automobile Liability: **$1,000,000** per accident
  • Employer’s Liability: **$1,000,000**
  • Professional Liability: **$2,000,000**
  • Cyber Liability: **$2,000,000**

The department will provide interested consultants with a secure link to download the as-built documents [...]. Each proposer will be **required** to sign a non-disclosure document.

Documents

1 file

Subscribe to get this document.

  • Sheriffs Med Jail HVAC RFP Nov 2026.pdf
    Download

Similar open bids

In California