Western Municipal Water District (California) posted this IFB on Nov 18, 2026. Responses are due Dec 18, 2026. Category: Construction - Heavy & Civil. Solicitation number W-335.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The goal of this Project is to provide permanent erosion repair and prevent future erosion of the existing Recycled Water (RW) Pond at the Western Water Recycling Facility (WWRF). The WWRF current average daily wastewater flow is around 1.5 MGD. Tertiary effluent from the plant is discharged to the recycled water storage pond. When the flow of recycled water exceeds irrigation demands, the excess treated water is stored in the existing pond until demand increases. The current storage pond capacity is 35 million gallons (MG).
Bid Items
Additive Bid Items
Payment
Payment for all Lump Sum Work shown or specified in Contract Documents is included in the Contract Price. Payment will be based on a percentage complete basis for each line item of the accepted Schedule of Values. An unbalanced or front-end loaded schedule will not be acceptable.
This item also includes all costs incurred for securing bonds, insurance, permits and financing prior to beginning the construction.
The project will be divided into two phases. Phase 1 includes the improvements of the pond's slopes in the vicinity of the existing Secondary Effluent Equalization Basins, and Phase 2 includes the improvements of the rest of the pond's slopes.