Oxic Basin Egger Valves for Wastewater Reclamation Facility (WRF)

Active 26-062 IFBConstruction - BuildingCity of Pueblo
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Pueblo (Colorado) posted this IFB on Nov 17, 2026. Responses are due Dec 9, 2026. Category: Construction - Building. Questions are due 2026-12-01 16:00. Solicitation number 26-062.

Solicitation details

General information

Solicitation number
26-062
Notice type
IFB
Place of performance
Colorado
Questions due
2026-12-01 16:00

Agency and category

Agency
City of Pueblo
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Pueblo is seeking a qualified Contractor to provide materials and labor for the Oxic Reactor Basin, we are seeking better air flow control then the current Butterfly valve can attain. We want to use Iris valves for better combination pressure reducing and pressure sustaining control for the Water Treatment Plant.

The work includes, but is not limited to, the removal of an existing 8 inch ABZ butterfly combination pressure reducing and pressure sustaining valve for a 8 inch pipe within the existing City of Pueblo, Water Treatment Plant; providing and installing a new 6 inch Egger Brand iris combination pressure reducing and pressure sustaining valve; removal of existing adjoining piping and fittings; providing and installing new adjoining piping and fittings; removal of existing appurtenances; providing and installing new appurtenances; and supports. The quoted prices must include Contractor providing all supervision, insurance, bonds, equipment, labor, materials and appurtenances, as needed, shown, or specified in this Invitation for Bid (IFB).

Scope

Task 1 – Pre-Construction Activities

  • Conduct a site visit and field verification of existing conditions.
  • Coordinate project schedule and work activities with City operations staff.
  • Develop and submit project-specific safety plans and work procedures.
  • Identify and verify existing utilities, equipment clearances, and access requirements.
  • Procure all materials, valves, piping, fittings, appurtenances, and support systems required for construction.

Task 2 – Demolition and Removal

  • Isolate the existing air flow control system in accordance with City operational requirements. City Electrical and Instrumentation Technicians will lockout power and disconnect 480v power and automation wiring.
  • Remove the existing 8-inch ABZ butterfly combination pressure reducing and pressure sustaining valve.
  • Remove existing adjoining piping, fittings, supports, and associated appurtenances as required to accommodate the new valve installation.
  • Dispose of removed equipment and materials in accordance with applicable regulations and City requirements.

Task 3 – Installation of New Valve System

  • Furnish and install eight (8) 6-inch Egger Iris® combination pressure reducing and pressure sustaining valves.
  • Modify and install new piping necessary to transition from the existing 8-inch system to the new 6-inch valve assembly.
  • Provide and install all required fittings, spools, flanges, couplings, reducers, gaskets, fasteners, supports, and mounting hardware.
  • City will restore power after Cities Instrumentation and Electrical Technicians reconnect 480v power and automation controls.

Task 4 – Mechanical Integration

- Connect the new valve assembly to the existing oxidation reactor air distribution system.

Task 5 – Testing and Commissioning

  • Perform system startup and operational testing.
  • Confirm pressure reducing and pressure sustaining functionality.

Task 6 – Project Closeout

  • Submit warranty documentation and manufacturer information.
  • Provide operation and maintenance documentation for the installed valve system.
  • Complete final inspection and obtain City acceptance.

Additional information

The City is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov by signing up at OpenGov Procurement. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.

Each bid must be accompanied by a certified check, cashier's check, money order or bid bond in the amount of five (5) percent of the grand total bid, plus all alternates if applicable, payable to the City of Pueblo as a guarantee that if the bid is accepted, the bidder will execute and file the proposed contract and bonds within ten (10) days from the date of the Notice of Award.

No alternates will be considered for this project.

Failure to complete the work by the allotted 60 calendar days shall result in the assessing of liquidated damages according to GENERAL PROVISIONS.

The Contractor shall make application for, and prepayment of, City sales and use tax on the estimated percentage basis being forty percent (40%) of the total Project bid as awarded.

Documents

9 files

Subscribe to get these 9 documents.

  • IMG_1730_Oxic_(6).jpeg
    Download
  • Licensing_and_Sales_Tax_Information.pdf
    Download
  • Iris_Valve_-_Aeration_Brochure.pdf
    Download
  • 1054692_-_Pueblo
    Download
  • _CO_IRIS_Proposal_REV1.pdf
    Download
  • Oxic_Basin_Egger_Valves_for_Wastewater_Reclamation_Facility_(WRF).pdf
    Download
  • Sample_Contract_Documents.pdf
    Download
  • 4701_-_Pueblo
    Download
  • _CO_-_Custom_Reducers_Scope_of_Supply_REV_1.pdf