City of Pueblo (Colorado) posted this IFB on Nov 17, 2026. Responses are due Dec 9, 2026. Category: Construction - Heavy & Civil. Solicitation number 26-036 (DT2401).
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
In general, this project will consist of the rehabilitation of 20 existing bus stops on the west side of Pueblo, including new concrete pads, curb and gutter, sidewalks, upgraded curb ramps, replacement of existing benches at select locations, installation of new benches where none currently exist, designated alighting areas, and illuminated bus stop signs as detailed in the plans and specifications for this project.
Bus Stop Package 2 is a distinct component of the larger West Side Improvements Project and includes only the work associated with the locations identified within this package.
In general, this project will consist of the rehabilitation of 20 existing bus stops on the west side of Pueblo, including new concrete pads, curb and gutter, sidewalks, upgraded curb ramps, replacement of existing benches at select locations, installation of new benches where none currently exist, designated alighting areas, and illuminated bus stop signs as detailed in the plans and specifications for this project.
These enhancements are intended to improve safety, accessibility, and ADA compliance, providing safer and more functional transit facilities for riders.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.