Active 27-43 IFBConstruction - BuildingCity of Norwich
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Norwich (Connecticut) posted this IFB on Nov 23, 2026. Responses are due Dec 11, 2026. Category: Construction - Building. Solicitation number 27-43.

Solicitation details

General information

Solicitation number
27-43
Notice type
IFB
Place of performance
Connecticut

Agency and category

Agency
City of Norwich
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Purchasing Agent, City of Norwich will receive proposals for 84 Taftville Occum Road, Norwich, CT. This project is being funded through the Property Rehabilitation Program and, or HUD Lead Based Paint Hazard Control in Priority Housing Program.

Scope

Heating Replacement

The existing Furnace is well passed it's expected (20 plus year) life span and has been experiencing frequent failures. Contractor is to remove and dispose of the existing oil fired furnace and any associated hardware as may be required for the installation of a replacement.

Install 1 new (oil fired) forced hot air Furnace: Remove existing and dispose of the existing Furnace and hardware as necessary to accommodate the installation of a new oil fired, forced hot air, condensing furnace. Product equivalency – Trane, Rheem, Lennox **(85% AFUE Minimum)**

Notes: Contractor to evaluate proper functioning of the exterior oil feed line and include any modifications that may be required for building code or manufacturer functioning of the new furnace. The owner has received unconfirmed information that the existing feed line is compromising the functioning of the existing furnace.

Alternate 1: Contractor will provide alternate pricing for the removal and replacement of the existing hot water heater and the installation of an electric, Hybrid/heat pump water heater to provide domestic hot water. Include leak pan and all plumbing modifications and utilities for complete installation. (Energy Star Rating required, 50 gallon tank capacity, Rheem, A.O. Stieble or approved equal.)

Note: Contractors are to price this alternate as a whole number do not add into the base bid.

Additional information

All bids are to be submitted via the City of Norwich Procurement Portal. Proposals will not be accepted by mail, in person or by email. All forms and associated documents must be uploaded through the procurement portal.

No Bidder may withdraw its bid within sixty (60) days of the bid opening date.

The City of Norwich reserves the right to reject and all bids, in whole or in part, to waive minor irregularities in the bidding and to award the bid to other than the low bidder if deemed in the best interest of the City.

The basic bid package shall be submitted as follows:

  • This Instruction Sheet with signed bidders certification
  • Payment Request from filled out and totaled.
  • Non-Collusion Affidavit.
  • Proof of insurance
  • Proof of licensure as a home improvement contractor in the State of Connecticut.
  • Proof of Licensure as a Lead Abatement contractor in the State of Connecticut ( if applicable )
  • Copies of all addendum sheets properly signed and filled out as directed.

The omission of any items listed in the Basic Bid Package will result in the disqualification of the bid.

The firm(s) whose bid(s) has/have been accepted by the City will be required to furnish all insurance certificates in the amounts specified, within 5 days from the date of the notice of award. The firm(s) will also be required to furnish all performance and payment bonds to the City prior to contract signing.

This project is allotted 10 calendar days to complete the specified scope from notice to proceed, barring weather and other excusable delays.