On-Call Professional Engineering Services for Wastewater Collection System Improvements

Active 27-42 RFQuArchitecture & EngineeringCity of Norwich
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Norwich (Connecticut) posted this RFQu on Nov 6, 2026. Responses are due Dec 15, 2026. Category: Architecture & Engineering. Questions are due 2026-12-08 14:00. Solicitation number 27-42.

Solicitation details

General information

Solicitation number
27-42
Notice type
RFQu
Place of performance
Connecticut
Questions due
2026-12-08 14:00

Agency and category

Agency
City of Norwich
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Norwich Department of Public Utilities (NPU) is soliciting statements of qualifications (SOQs) from engineering consulting firms to provide professional engineering and construction services on an on-call basis for project categories related to wastewater collection system improvements. It is the intent of NPU to create an on-call list of qualified and selected engineering consulting firms in each of the categories defined in Section 2 of this request for qualifications (RFQ).

NPU is seeking experienced, multi-disciplinary, full-service, engineering consulting firms to provide on-call engineering, construction management, and construction inspection services for wastewater collection system improvements. NPU will execute multiple on-call agreements under this RFQ. Each category of work will have its own on-call list of qualified and selected engineering consulting firms.

Scope

NPU annually establishes a capital improvement budget for wastewater collection system improvements, consisting of projects identified as critical to the reliable and efficient operation of its wastewater utilities. NPU relies on engineering consulting firms to develop these projects from concept into construction by providing various engineering services, including, but not limited to, conceptual engineering reports, engineering investigations, feasibility studies, final design documents for bidding, construction cost estimating, and construction inspection and administration.

Category 1: Wastewater Collection System Horizontal Assets

  • Sanitary Sewer Replacement and/or Rehabilitation: Design services for the rehabilitation and/or replacement of existing sanitary sewers for the purposes of structural integrity, increased capacity, increased service life, and elimination of excessive infiltration and inflow (I/I).
  • Trunk/Interceptor Sanitary Sewer Replacement and/or Rehabilitation: Design services for the replacement and/or rehabilitation of existing trunk and interceptor sewers generally of the diameter 15-inch or larger [...].
  • New Sanitary Sewer Mains: Design services for new sanitary sewers, including canvassing property owners, developing preliminary engineering reports, flow monitoring of existing sanitary flows, and attendance at public hearings.
  • Sanitary Sewer Separation Projects: Design services for either new sanitary or new storm sewers, along with all necessary service connections and appurtenances.

Category 2: Wastewater Pump Stations

This category shall include professional engineering and construction services for new wastewater pump stations and existing wastewater pump stations to be upgraded and/or rehabilitated.

  • Facility Planning: conceptual-level planning and design; existing condition evaluations; cost evaluations; and permitting.
  • Civil and Site Design: site investigations; utility verification; site layout, access, and security; yard piping; property easements and acquisitions; geotechnical investigations; and environmental evaluation and hazardous materials abatement.
  • Hydraulic Analyses: flow and capacity evaluations; flow monitoring; hydraulic modeling; future buildout projections and analyses; and transient and surge analyses.
  • Structural Analysis and Design: structural integrity investigation and evaluation; painting and coating inspections; foundation design; and structural steel analysis and design.
  • Architectural Services: building infrastructure and code reviews; building envelop analyses and design; and hazardous building material inspection and abatement.
  • Electrical Engineering Services: electrical distribution design and coordination studies; electrical system design, including switchgear and motor control centers; arc flash studies and analyses; emergency generator systems; and energy audits and energy-efficiency improvements.
  • HVAC, Plumbing, and Fire Protection Services: mechanical system analyses and design; HVAC system analyses and design; plumbing design; fire-protection system design; and life safety system review and design.
  • Instrumentation and Control Services: piping and instrumentation diagrams development; instrumentation specifications; flow and pressure measurement; supervisory control and data acquisition system (SCADA) design and programming; automation enhancements and upgrades; and real-time control analyses and implementation.

Additional information

**Submission method:** SOQs will be received on **December 15, 2026**, through the City of Norwich Procurement Portal at the following website: https://norwichct.bonfirehub.com/portal/?tab=openOpportunities. No SOQs will be accepted after the **2:00 P.M.** deadline. SOQs will not be accepted by mail, in person, or by email.

The on-call agreements which result from this RFQ will be for a base period of three (3) years with an additional two one (1) year option periods which may be exercised at the sole discretion of NPU.

Selection criteria

  • Corporate Organization (10%)
  • Relevant Experience and References (50%)
  • Staff Qualifications (40%)

The Selection Committee may elect to conduct interviews with some or all of the firms responding to this RFQ.

Insurance

A valid Certificate of Insurance verifying each of the coverages required above shall be issued directly to NPU within ten (10) business days after contract award and prior to starting any work. Employer's Liability is **$1,000,000**, Commercial General Liability is **$1,000,000** each occurrence and **$2,000,000** aggregate, and Professional Liability is **$1,000,000** per claim.

The requirement for DBE subcontractor participation [...] shall be a minimum of 8.0 percent with the following makeup: minority business enterprise (MBE) participation of 3.0 percent; and woman business enterprise (WBE) participation of 5.0 percent.

Documents

1 file

Subscribe to get this document.

  • 27-42 On-Call Professional Engineering Service for Wastewater Collection System Improvement.pdf
    Download

Similar open bids

In Connecticut

More from City of Norwich

Open bids