B027-28 Evansville Water Treatment Plant Improvements

Active OpenGov-94035d72 ITBConstruction - Heavy & CivilCity of Meriden
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Meriden (Connecticut) posted this ITB on Nov 18, 2026. Responses are due Dec 15, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-09 16:00. Solicitation number OpenGov-94035d72.

Solicitation details

General information

Solicitation number
OpenGov-94035d72
Notice type
ITB
Place of performance
Connecticut
Questions due
2026-12-09 16:00

Agency and category

Agency
City of Meriden
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Meriden is seeking competitive bids from qualified contractors for comprehensive electrical and mechanical infrastructure improvements at the Evansville Water Treatment Plant.

Originally constructed in 1970, the facility operates at a maximum flow rate of 2.0 MGD (million gallons per day) and an average daily flow of 0.90 MGD. The plant serves as the primary water supply for the East Side Carpenter Pressure Zone and the Carpenter Avenue Tank, drawing water from the East Well through three greensand media pressure filters.

The primary goal of this modernization project is to replace the inefficient, fixed-speed system with advanced Variable Frequency Drives (VFDs) and fully upgrade the supporting electrical distribution infrastructure.

Scope

Demolition & Disposal

  • Equipment Removal: Disconnect, remove, and properly dispose of the existing Motor Control Center (MCC), motor starters, and associated control cabinets.
  • Site Clearance: Clean and prepare the existing electrical footprint for the installation of new equipment.

Electrical Infrastructure Upgrade

  • Main Power Panel: Supply and install a new 480-volt, 800-amp power panel to refeed the well and finished water pumps.
  • Step-Down Transformer: Supply and install a new 30kW, 480V to 120/208V transformer.
  • Distribution Panel: Supply and install a new 100-amp bolt-in panel to handle the building's 120/208-volt loads.
  • Building Wiring Reconfiguration: Revamp and clean up existing building wiring, routing circuits into the newly installed panels and breakers.
  • Add any additional equipment necessary to ensure the proper operation of the existing pumps and motors

Pumping & VFD Integration

  • VFD Installation: Supply, install, and configure three (3) new Variable Frequency Drives (VFDs) for the finished water pumps and one (1) new Variable Frequency Drive (VFD) on the east well pump.
  • Control Philosophy: The VFDs must be integrated to modulate finished water pump speeds automatically based on Clearwell levels and system demand, replacing the current practice of throttling discharge valves.

Testing, Commissioning, & Training

  • System Testing: Perform comprehensive loop testing, electrical insulation testing, and operational dry/wet runs on all newly installed equipment.
  • Commissioning: Provide startup certification by factory-authorized technicians for the VFDs.
  • Training: Provide on-site operational and maintenance training for plant staff.

Constraints & Operational Continuity

  • Extended shutdowns will not be permitted.
  • The Contractor must submit a detailed Sequence of Operations and Bypass Pumping/Pumping Plan to maintain continuous system pressure and tank levels during construction. [...]

Deliverables & Submittals

  • Shop drawings and product data for the 800A panel, 30kW transformer, VFDs, and valves.
  • As-built electrical schematics and P&ID drawings upon project completion.
  • Operations & Maintenance (O&M) manuals for all newly installed hardware.
  • Manufacturer warranty certificates.

This scope is to be Bid as "Evansville Plant Improvements"

Filter Vessel Repairs

  • Inspect, weld, patch, clean and repaint rusted and pitted areas of the Green-sand pressure vessels. (3 total)
  • Remove and Replace Supports for Filter Vessels: Supports for the tanks are rusted and need to be removed and replaced.

This scope is to be Bid as "Filter Vessel Repairs"

Additional information

**Submission method:** The City will only be accepting electronic submissions of bids and proposals via the City eProcurement Portal: https://procurement.opengov.com/portal/meridenct. Bids are due no later than **11:00 am, Tuesday, December 15, 2026**. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties.

Bidders are to examine all documents and visit the site in order to make a thorough examination of the conditions.

**Required forms:** *Non-Collusive Bid Statement* (must be notarized and sealed/stamped), *Bidder's Qualification Statement*, and *Request for Status as a Meriden Based Business*.

No bidder may withdraw its bid within ninety (90) days of the date of the bid opening. The Purchasing Officer reserves the right to make an award on the bid which best meets the specifications and is deemed to be in the best interest of the City of Meriden. In determining the lowest responsible bidder, the Purchasing Department shall also consider Local Preference.

**Liquidated damages:** Five Hundred Dollars ($500.00) for each day of delay.

**Insurance:** The successful bidder shall be required to provide a Certificate of Insurance denoting general liability, automobile liability, workers compensation liability, and other coverage required by the City's Risk Manager. Minimum limits are General Liability $1,000,000 each occurrence and $2,000,000 general aggregate, Auto Liability $1,000,000 combined single limit, Umbrella $1,000,000, and Workers' Compensation at statutory limits with Employers' Liability $1,000,000.

The Agreement for the work will be via Purchase Order and Standard Contractors Services Agreement. The City will make payment to the Contractor not less than thirty (30) days following completion of services.

Documents

3 files

Subscribe to get these 3 documents.

  • B027-28_Evansville_Water_Treatment_Plant_Improvements.pdf
    Download
  • General_Insurance.pdf
    Download
  • Contractors_Agreement.pdf
    Download

Similar open bids

In Connecticut

More from City of Meriden

Open bids