The project will include the construction of approximately 3,000 linear feet bituminous concrete multi-use trail which will run along the north side of Tariffville Road, over an existing sidewalk on the Tariffville Road bridge crossing the Farmington River, to Curtiss/Pattison Parks. A boardwalk section will be constructed within and adjacent to wetlands within the Farmington River riparian corridor.
The project will include the construction of approximately 3,000 linear feet bituminous concrete multi-use trail which will run along the north side of Tariffville Road, over an existing sidewalk on the Tariffville Road bridge crossing the Farmington River, to Curtiss/Pattison Parks. A boardwalk section will be constructed within and adjacent to wetlands within the Farmington River riparian corridor.